Laserfiche WebLink
Communications Advisory Committee <br />December 19, 2009 <br />Meeting Minutes <br />Page 2 <br />order of October 19, 2009 granting RCN relief from FCC requirements for <br />system performance tests for its digital cable system. Montgomery County <br />argues that neither RCN nor the FCC properly notified RCN franchising <br />authorities of its petition, resulting in the FCC receiving no comments in <br />opposition to the petition. Dave Becker confirmed that RCN's license <br />would require RCN to notify Lexington of such a filing; no such filing <br />was received by the Town. The committee decided to contact RCN <br />representative Tom Steel via email to inquire how this would impact <br />Lexington and to remind him of the license requirement. <br />c. LexMedia RFP. The Town has determined that a full RFP process will be <br />required for a new public access corporation contract, rather than a simple <br />new contract negotiation with LexMedia, due to State requirements for "goods <br />and services" procurements. This process requires obtaining input from the <br />community served by the public access provider, including citizens, schools, <br />and community groups. The LexMedia subcommittee expressed its concern <br />over the amount of time available to conduct a formal RFP process. The <br />committee discussed the amount of effort involved, and considered the <br />possibility of entering into a contract with a term longer than five years. <br />The following motion was approved: <br />That the Committee request permission from the Town to commit to a <br />term of up to ten (10) years in a new contract with a public access <br />corporation. <br />6. Selectmen's Liaison report. George Burnell had no additional comments. <br />7. Report from the Town Director of IT/MIS. Dorinda Goodman reported on <br />progress in getting fiber connections to the Town's new network head end in the <br />DPW building, as well as Town needs for fiber connectivity to Town -owned <br />locations including the golf course and the water tower. Goodman pointed out that <br />Verizon "copper wire" connectivity to the water tower, which has a major <br />municipal radio network facility, has been unreliable. Goodman also reported on <br />an issue the Town had with its internet connectivity from RCN. All broadband <br />connectivity was lost for several days, and restoral efforts and escalation by RCN <br />were inadequate. Jeanne Canale will inform RCN representative Tom Steel of the <br />Town's concerns. The committee also discussed the possibility of LexMedia <br />obtaining some internet bandwidth from the Town's allocation from RCN to <br />provide greater uplink speeds for LexMedia's program streaming to town <br />residents. <br />8. LexMedia report. Florence DelSanto reported she will be providing LexMedia's <br />next financial report to the Town Manager in January. She reported that the <br />underwriting campaign is progressing. A consultant was hired to put together an <br />underwriting package. Shire Pharmaceutical has committed to underwrite a series <br />of science programs. Similarly, In Shape will underwrite health and fitness tips. <br />