|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1986-02-BOS-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Select Board-SB (formerly Selectmen, Board of-BOS)
>
Minutes
>
1980-1989
>
1986
>
1986-02-BOS-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2019 12:53:54 PM
Creation date
3/15/2010 11:50:44 AM
Metadata
Fields
Template:
Archives
Department
Selectmen
Keywords or Subject
BOS - Board of Selectmen
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�f 1 <br />1) -3- <br />Selectmen's Meeting . <br />BOSTON EDISON HEARING � DANE ROAD <br />February 11 1886 <br />Mr. Marshall opened the public hearing on the petition of Boston Edison <br />for permission to install underground conduit to service 11 Dane Road. <br />Carol McM anus, representing Boston Edison, explained that the resident, Mr. <br />Golden, had requested the change from overhead to underground lines. Mr. <br />Tonaszuck's memo, describing the request and recommending approval, was <br />noted. <br />There be inq.no questions or comments in favor or in opposition, the <br />hearing was declared closed. <br />Upon motion duly rude and seconded, it was voted to approve the <br />petition of the Boston Edison Company for installati of e feet of <br />conduit in Dane Road, northwesterly approximately 340 -feet south of Foster <br />Road. <br />BOSTON EDISON HEARING - NORTH STREET <br />The Chairman opened the public Hearing on - the petition of the Boston <br />Edison Company for permission to install conduit'at 20 North Street as <br />requested by Mr. Slack, who wishes to change from overhead to underground <br />electrical service <br />Mr. Tonascuck's memo recommending approval and pointing out the need to <br />obtain a street opening hearing, was noted. <br />Ms. McManus described the work necessary to install underground service <br />to Mr. Slack's home. <br />There being no questions or comments in favor or in opposition, the <br />hearing was declared closed. <br />Upon motion duly made and seconded, it was voted to approve the <br />petition of Boston Edison Company for permission to install 13'+ of conduit <br />in North Street easterly approximately 885 feet southeast of Burlington <br />Street, <br />HOUSING AUTHORITY CEDAR STREET TEWKSBURY STREET MASS. AVENUE HOUSING <br />Mr. McLaughlin, Chairman of the Housing Authority and Mrs. Sullivan, <br />Housing Authority Director, were present to update the Board on progress <br />with construction of housing for handicapped on Cedar Street. A plan <br />showing the design and siting on the lot of the house was displayed. This <br />.building will house four persons, rather than the eight originally planned. <br />It is now planned that housing for four additional persons will be <br />constructed on Tewksbury Street, identical in design to the Cedar Street <br />building. Mr. McLaughlin forecast completion of this housing be late summer <br />The Authority's next project will be family housing for, handicapped on <br />Ma Ave. near Oak Street. <br />Mr. Marshall expresssed the appreciation of the Board for the progress <br />report and thanked the.Housing Authority for the information given. <br />
The URL can be used to link to this page
Your browser does not support the video tag.