|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2007-11-19-CPC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Community Preservation Committee-CPC
>
Minutes
>
2006-2009
>
2007
>
2007-11-19-CPC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 11:16:51 AM
Creation date
12/8/2009 6:52:42 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CPC - Community Preservation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />? T.O.B, Cary Hall, LPD. - $127,000-gutters and storm windows are extraordinary <br />repairs and bondable. All three buildings are in the HD so the repairs are thought <br />to be eligible. “Rehabilitation to make a building functional for intended use.” <br /> <br />?T.O.B. ADA ramp and front door-$220,000- Commission on Disabilities question <br />– Is there a prioritized list from the Disabilities Com.? CPC requests a design as <br />well. <br /> <br />? Cary Hall –electrical work- withdrawn <br /> <br />?Fire Station floor- $665,000- withdrawn. The floor is flexing and there are utilities <br />under it, which complicates the situation. <br /> <br />? Fire Station HQ- $40,000- Carl said that the feasibility study should be done first <br />and then look for design money next year. (The fire station is a historic building <br />and preserving it for its intended use.) <br /> <br />? Munroe Fire System Replacement-$600,000- sprinkler and use design. What is <br />the ultimate use of the building before the Town appropriates funds of this <br />magnitude? Is rent being paid and if so, how much? <br /> <br />? Stone Building- Exterior and structure needs to be preserved and there is more <br />concern after the flooding problem. What is the ultimate use of the building? <br />When will the study be done? April? <br /> <br /> <br />?Senior Center Plan- $127,719- Where did the $35,000 go that was appropriated by <br />TM last spring? Is that part of this amount? White House- what can it <br />accommodate? Muzzey- what can a 2 site campus accommodate? What types of <br />programs can happen with a reconfigured Muzzey? <br /> <br /> <br />?Town Hall Use Study and Renovation Design- $100,000 for reconfiguring office <br />space and creating design documents. Please ask Town Counsel Bill Lahey if <br />eligible. The product would be a layout and cost estimates. Phase II would be <br />actual drawings used for bidding purposes. Code issues with regard to fire and <br />electrical need to be addressed. <br /> <br /> <br />The meeting was adjourned at 6:00pm <br /> <br />Respectfully submitted, <br /> Betsey Weiss <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.