Laserfiche WebLink
BUDGET REVIEWS <br />Mr. white reviewed an alternate " "A "" 3 budget proposal, � g p posal, prepared at the <br />request of the Board, which was developed with no revenue restrictions and <br />included funding for programs not listed in his proposed "B " or maintenance <br />budget: <br />A $100 appropriation for Article 5 which would provide 4 to 5% <br />salary increases; $59,580 for DPW which would save one engineering position, <br />$ p ' <br />allow two stone walls to be rebuilt and repainting of the two fire stations; <br />$78,400 to preclude closing of the East Lexington Fire Station durin g summer <br />months; under General Government, $52,404 to retain a switchboard operator <br />and upgrade computer software; $180,000 to upgrade the Harrington School <br />soccer field; $265,000 to allow for a 0 -route LEXPRESS operation; $30,000 to <br />allow Libraries to stay open on Sundays and open at the usual hour; $30,767 <br />for the D.A.R.E. program; $66,783 to renovate the Police dispatch area• <br />_.� 35,000 to supplement the Recreation Enterprise Fund; $29,495 for weed control <br />at the old Res; $72,000 to fund RePlace; and $300,000 for street resurfacing. <br />g <br />Of these items, the Manager suggested giving priority to RePlace; <br />LEXPRESS, D.A.R.E., Reservoir weed Control, and the East Lexington Fire <br />Station. <br />Board members expressed their individual positions on priorities, as <br />follows: <br />Mr. Eddison listed LEXPRESS as the top item, RePlace for its importance <br />to the young, weed control at the Old Res, the East Lexington Fire Station , <br />the Library, which he felt should be open on Sundays and at the usual time in <br />the morning. He felt that he could defend those items, which totalled <br />$500,000 ±. <br />Mrs. Smith placed LEXPRESS first, with RePlace, the Libraries, the <br />D.A.R.E. program, Old Res weed control following and, if at all possible, to <br />include the Engineering position and the East Lexington Fire Station. She <br />felt that she could support a $500,000+ override. <br />Mr. McSweeney said that he was still favoring the "B " budget and working <br />within the funds available. He hoped that RePlace could be retained and saw <br />value in the D.A.R.E. program, as well as weed control at the Old Res. <br />Regarding the $35,000 proposed in the "A " budget for the Recreation Enterprise <br />Fund supplement, he hoped that funds for that purpose could come from the Pine <br />Meadows operation. <br />Mr. Dailey expressed hope that the Selectmen could go to Town Meeting <br />unified in a recommendation for a budget. He would support further <br />exploration of the RePlace request and the East Lexington Fire Station, <br />Regarding LEXPRESS, he said that the MBTA subsidy appears to be safe for now <br />but he was not assured of its continuance in the future. <br />He hoped for action by the School Committee similar to the Selectmen's <br />in its budget considerations. <br />He said he was not ready to support an override, without every effort <br />being made not to go beyond available funds. <br />Mr. Marshall agreed that agreement should be reached on a budget to <br />bring to Town Meeting but he felt that an override would be needed. He did <br />not support the School's request for a 6% budget increase, $1,000,000 more <br />than in the Town's budget. <br />