|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-05-14-LBAC-MIN
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2000-2009
>
2009
>
2009-05-14-LBAC-MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2009 11:25:13 AM
Creation date
8/28/2009 11:24:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />MEETING MINUTES <br /> <br /> <br />Committee Name: Lexington Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />May 14, 2009, 7 pm, Rm.111 Town Office <br />Building <br /> <br />Members Present: <br />Peggy Enders (Chair), Stew Kennedy, Mike Tabaczynski, <br />John Frey, Jerry Van Hook, Marita Hartshorn, George Gagliardi, Abe Shenker <br />(FoLB Chair), Laurel Carpenter <br /> <br />Others Present: <br /> Chris Lokem-Kim, Margaret Stebbins, Steve Meinelt, Bob <br />Dangel, and Richard Spencer <br /> <br />Members Absent: <br />Richard Canale (Planning Board Liaison), Hank Manz, <br />(Selectmen’s Liaison), Sandra Shaw (Recreation Committee Liaison) <br /> <br />Minutes: <br />April 16, 2009 minutes were accepted as corrected. <br /> <br />Bike Racks: <br /> Marita and Peggy met with Dave Pinsonneault. With the remaining <br />money granted from the state, we plan to buy 6 more racks. Two will be <br />replacements, one for the rack destroyed by the snowplow behind Craft <br />Cleaners, one for the rack at the Old Res to replace the vandalized rack, one <br />large rack at LHS, one 6’ rack behind Michelson’s, one at Bow Street Park, and <br />one at the soccer field at Harrington School. To deal with the overcrowded racks <br />at Cary Library, we plan to put up a sign pointing to more bike parking in the back <br />of the library and to ask the HDC and library to consider changing the orientation <br />of the rack in the front. <br /> <br />Shire 5 K Run: <br />Steve Meinelt from the Running Company is working with Shire <br />to organize what he hopes to be an annual event -- a 5K run on Sunday, June <br />14, starting from the Visitors’ Center at 4:00 p.m. Proceeds from the entry fees <br />will be used to award a significant scholarship to a LHS graduate and to help <br />underwrite Bikeway plowing to keep the path free for runners during the winter. <br />Steve suggested we set up a table at the event to help publicize plowing the <br />bikeway. <br /> <br /> <br />May Bike Counts <br />: Peggy reported that, for the count on Saturday, May 9, a <br />total of 2709 trips were counted at the Depot on the bike path during the 12-hour <br />counting (i.e., 7 am to 7 pm). 1863 of these trips were bicyclists. On Tuesday, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.