|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2006-03-09-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2000-2009
>
2006
>
2006-03-09-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2009 12:44:14 PM
Creation date
6/10/2009 12:44:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />MEETING MINUTES <br /> <br /> <br />Committee Name: Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />March 9, 2006; 7:00 pm; Rm G-15, Town Office Building <br /> <br />Members Present: <br />Stew Kennedy (chair), Harvey Bingham (scribe), John Frey, Erna Greene, Jim <br />Wichmann <br />Others Present: <br />Rich Spencer (FOB) <br />Members Absent: <br />Marita Hartshorn, Abe Shenker, Mike Tabaczynski, Jerry VanHook <br /> <br /> <br />Record of Votes taken and issues discussed. <br /> <br />Minutes <br /> from the February 9 meeting were reviewed, corrected and accepted as corrected. <br /> <br />Abutters Survey: <br />The consensus of those present was that no further action be taken. <br /> <br />Bikeway Signage: <br />Regarding our survey of missing and damaged signs along the Bikeway, the inputs <br />need to be collected, so we can report to DPW. Several of us haven’t done our surveys yet: only Rich <br />and Harvey have reported their findings. Findings should be emailed to Abe and Stew. <br /> <br />Miscellaneous <br />: <br />1. The MWRA sewer relining project (to extend along the Bikeway about 1000 feet <br />roughly between the two North Lexington Brook crossings east of Revere Street) is still <br />being planned for this spring. Bids were to have closed in February, with the work <br />possibly starting by late March. We were promised to be invited to the pre-project <br />meeting. <br />2. Mike has selected May 27 for the date of the final boardwalk project in Dunback <br />Meadow. The holiday weekend couldn’t be avoided if we want to take advantage of <br />th <br />LHS 9-grade Earth Science class volunteers this school year. In the preceding week <br />we’ll need a few skilled volunteers to build the bridge over Clematis Brook so that the <br />boardwalk material can be carried across. Mike will put the project announcement in to <br />the school. <br />3. When Rich met last year with Dave Pinsonneault about the Bikeway edge mowing, <br />Dave asked that we meet with him this spring before the mowing season arrives. At the <br />April meeting we should decide who will do this. <br />4. Stew reported that Susan Bennett (Lexington Historical Society) mentioned last week <br />that the schedule for work on the pavement behind the Depot building has been delayed <br />and may not get done this year. Thus she asked if we’d approve the temporary return of <br />the bike racks there. She was assured we are in favor of that. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.