Laserfiche WebLink
— Don't understand what two Feno markers along the outside of the lawn are <br /> accomplishing. It is odd to have markers on the outside of the lawn and suggests to put <br /> one in the backyard where the erosion control crosses the 25-foot buffer zone and another <br /> at the other end at the 50-foot buffer zone. <br /> — How is the stormwater on the driveway being handled? <br /> — Would like to see the 25-foot"no disturb" zone restored. It will eliminate squaring of the <br /> lawn but it is the buffer zone. <br /> Responses from the Representative: <br /> — Typically the Commission requires the Feno markers along the edge of naturally <br /> vegetated lawn from property boundary to property boundary. The intent is to square <br /> things off as much as possible to have a reasonably sized backyard with 50% natural <br /> vegetated land versus 43% in existing conditions. However, the developer expressed a <br /> willingness to adjust the Feno marker locations and to increase the area of`no disturb' <br /> buffer restoration. <br /> — The driveway runoff will shed onto the lawn. The infiltration system will take roof runoff <br /> only. There is a slight rise to the garage door from the driveway. <br /> On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 7-0 by roll call <br /> vote to continue the hearing to the March 29, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:20 PM <br /> Continued Public Meetings/Hearings <br /> ViewPoint Cloud Permit#CNOI-21-5, DEP#201-1212 <br /> Notice of Intent: 5 John Hosmer Lane <br /> Applicant/Property Owner: Aman Narang <br /> Project: Convert an existing tennis court to an in-ground swimming pool with patio and pool <br /> shed, and conduct associated landscape work. Portions of the proposed project are located within <br /> the Buffer Zone to BVW. <br /> Previous Meeting Date: 3/1/2021 <br /> Supplemental Documentation: <br /> — "Proposed Site Plan of Land", Sheet 2 of 4; "Utility and Grading Plan"; Sheet 3 of 4; <br /> Prepared for: Aman Narang; Prepared by: Meridian Associates; Stamped and signed by: <br />