Laserfiche WebLink
— Memorandum from Frederick W. Russell, PE, to Scott Seaver, Seaver Construction; RE: <br /> 25 Oxbow Road, (Estimated Seasonal High Water Table); Dated 12/9/2020; <br /> — "Description of Work"; Prepared by: Mary Trudeau; Not Dated; <br /> — Letter from Mary Trudeau to Scott Seaver, Seaver Construction; RE: "25 Oxbow Road, <br /> Lexington, MA Wetlands Delineation"; Dated 12/10/2020; <br /> — Plot Plan; Prepared by: Keenan Survey; Scale: 1"=20% Dated 12/22/2020; <br /> — "National Flood Hazard Layer FIRMette"; Prepared by: FEMA; Scale: 1:6,000; Exported <br /> on: 12/10/2020; <br /> — "Residential Addition—23 Oxbow Road" (DEP4201-993); Prepared for: Better Built <br /> Homes; Prepared by: Howard Stein Hudson; Scale: 1"=20% Dated 7/21/2015 and revised <br /> through 9/15/2015; <br /> — Stormwater Management Report; Prepared and signed by: Frederick W. Russell, PE Civil <br /> No. 36713; Not dated; <br /> — WPA Form 3 —Notice of Intent application; Prepared by: Mary Trudeau; Prepared for: <br /> Seaver Construction; Signed 1/4/2021; <br /> — Site Plan—25 Oxbow Road; Prepared for: Seaver Construction; Prepared by: Frederick <br /> W. Russell, PE; Scale: 1"=20' and as noted not to scale; Dated 12/7/2020 and revised <br /> 1/3/2021; <br /> Ms. Mary Trudeau, Wetland Scientist representing the Applicant, presented before the <br /> Commission. After discussions with Ms. Mullins, Ms. Trudeau agreed that there is a 50 foot <br /> difference in the wetland delineation lines for the property of 25 Oxbow and the property of 23 <br /> Oxbow. The Commission could not make a decision on the wetland delineation due to ice <br /> coverage and frozen ground during the time of the site visit. For the purpose of moving the <br /> project forward, and not forcing the applicant to wait until spring to determine the wetland <br /> boundaries, Ms. Trudeau and the Commission have agreed to use the 2015 23 Oxbow <br /> delineation. Due to this, the proposed house is now within the 5 0-100 foot buffer zone and will <br /> need to meet the Lexington wetland regulations for stormwater management. Mr. Frederick <br /> Russell, Project Engineer, is redesigning the stormwater system to meet the new requirements <br /> while also looking at options to minimize tree removal on the lot. <br /> Comments from the Commission: <br /> — The existing grade has a mild Swale towards the wetland and the revised grading will <br /> tend to shed more water towards the property to the south. Would like to see the <br /> contouring modified to prevent that additional shedding of water to the abutting property. <br /> Response from the Representative: <br /> — Modifying the contour to create a Swale and contain runoff on this property will not be a <br /> problem. <br /> On a motion by Mr. Langseth and seconded by Ms. Ladd, the Commission voted 6-0 by roll call <br /> vote to continue the hearing to the February 16, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br />