Laserfiche WebLink
corner of Peacock Farm Road and will provide a better opportunity for a safe exit. The property <br /> has a transitional wetland with a large mix of upland and wetland plants all throughout the <br /> flagged area. The applicant is also proposing to replace the blue stone patio with pervious pavers <br /> at the front of the lot. The driveway is graded downward towards the garage and they are <br /> proposing a strip drain with the sump box. The water table was somewhat high but was found to <br /> be reasonable. <br /> Questions from the Commission: <br /> — Could you add a detail on the site plan measuring the exact distance of the closest <br /> structure to the wetland? <br /> Response from the Applicant: <br /> — Yes we can add that measurement to the site plan and it is about 54 feet from the wetland <br /> line. <br /> The applicant has not received a favorable engineering report for the updated plans from the <br /> town engineer. <br /> On a motion by Ms. Ladd and seconded by Mr. Langseth, the Commission voted 5-0 by roll call <br /> vote to continue the hearing to the August 10, 2020 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Philip Hamilton—Aye <br /> (2:59:50 for LexMedia Recording) <br /> ViewPoint Cloud#CNOI-19-27, DEP 201-1163, BL 1118 <br /> Notice of Intent, 91 Hartwell Avenue <br /> Applicant: John Cappellano <br /> Project: Construction of lab and office building, above ground parking garage and associated <br /> infrastructure <br /> Previous Hearing Dates: 11/18/2019, 2/24/2020, 5/18/2020, 6/15/2020 <br /> Additional Documentation Submitted: <br /> Hydrology Log, dated July 20, 2020. Prepared by Haley and Aldrich, INC <br /> Inspection and Maintenance Log <br /> Mr. Richard Kirby, LEC Environmental, presented before the Commission. The applicant has <br /> prepared a revised Operation and Maintenance plan to include a more robust inspection and <br /> maintenance log, as well as detailed invasive species management. <br /> Questions and Comments from the Commission: <br />