Laserfiche WebLink
— Memorandum from Mickey Marcus, SWCA to Arlington Conservation Commission and <br /> Cc: Lexington Conservation Commission; RE: "Revised Plans and information for <br /> Arlington Restoration Master Plan Phase II"; Dated 12/31/2020; <br /> — 90% Construction Document Set—"Site Preparation and Demo Plan"; Sheet L1.1; <br /> Prepared by: Kyle Zick Landscape Architecture, Inc.; Scale: 1"=40' and 1"=30% Dated <br /> 12/19/2020 and Revised 12/30/2020; <br /> — 90% Construction Document Set—"Site Preparation and Demo Plan"; Sheet Ll.2; <br /> Prepared by: Kyle Zick Landscape Architecture, Inc.; Scale: 1"=40% Dated 12/19/2020 <br /> and Revised 12/30/2020; <br /> — 90% Construction Document Set—"Layout and Material Plan"; Sheet L2.2; Prepared by: <br /> Kyle Zick Landscape Architecture, Inc.; Scale: 1"=40% Dated 12/19/2020 and Revised <br /> 12/30/2020; <br /> — "Notice of Intent—Additional Information"; Provided by: Kyle Zick Landscape <br /> Architecture, Inc.; Dated 12/30/2020; <br /> — Arlington Reservoir Phase 2—"Drainage Plan" C1.0 and "Erosion and Sediment Control <br /> Details" C2.0; Prepared by: Woodard and Curran; Signed and stamped by: Denise L. <br /> Cameron, PE Civil No. 53548; Scale: 1"=30' and not to scale; Dated 11/2020 and revised <br /> 12/30/2020; <br /> — "Stormwater Management Report"; Prepared by Woodard and Curran; Signed and <br /> stamped by Denise L Cameron, PE; Dated 10/2020 and revised 12/2020; <br /> — "Pre-Development Catchment Figure" Figure l; Prepared by: Woodard and Curran; <br /> Scale: 1"=150'; Dated October 2020; <br /> — Memo from Kyle Zick Landscape Architecture, Inc. to Lexington Conservation <br /> Commission; RE: "Notice of Intent—Additional Information"; Dated 1/8/2021; <br /> — 90% Construction Document Set—"Layout and Material Plan", L2.1, L2.5 and L2.4; <br /> Prepared by: KZLA; Dated 12/19/2020 and revised 12/30/2020 <br /> Mr. Kevin Beuttell and Mr. Duke Bitsko both recused themselves from the discussion due to <br /> involvement with other projects in the Town of Arlington. <br /> On a motion by Mr. Langseth and seconded by Ms. Dohan, the Commission voted 5-0 by roll <br /> call vote to close the hearing. <br /> Record of vote as follows: <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:46 PM <br /> ViewPoint Cloud Permit#AOOC-20-13, DEP#201-1190, CNOI-20-20 <br /> Amendment to Order of Conditions, 11 Norton Road <br /> Applicant/Property Owner: Speedwagon Partners, LLC <br />