Laserfiche WebLink
Project: the installation of approximately 2,028 linear feet of new underground duct line to bring <br /> additional electrical circuits from Eversource's existing Hartwell Substation 533 on Hartwell Ave <br /> to the MIT Lincoln Laboratory facility on Wood Street in Lexington, MA. <br /> Previous Meeting Dates: 1/4/2021 <br /> Supplemental Documentation: None <br /> Ms. Rebecca Weissman, representative from SWCA Environmental and Mr. James Clancy, <br /> representative from Eversource Energy, presented before the Commission responses to questions <br /> from the previous meeting. Ms. Weissman stated that Eversource is anticipating construction to <br /> begin in April 2021 and expecting to last about three months. <br /> On a motion by Mr. Langseth and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br /> vote to close the hearing. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:56 PM <br /> ViewPoint Cloud Permit# NOI-20-32, DEP#201-1203 <br /> Notice of Intent, 72 Grassland Street <br /> Applicant/Property Owner: Venkat Mannem <br /> Project: Construct an addition to a single-family dwelling and wooden deck, within the 100-foot <br /> buffer zone. Erosion controls and stormwater management are proposed, and wetland and Buffer <br /> Zone restoration to improve existing site conditions. <br /> Previous Meeting Date: 12/14/2020, 1/4/2021 <br /> Supplemental Documentation: <br /> — "Drainage Plan" C-0; Prepared by: Gala Simon Associates, Inc.; Stamped and signed by: <br /> Alberto M. Gala, PE Civil No. 36434; Scale: 1"=10' and not to scale; Dated 11/3/2020 <br /> and revised (Drainage areas) through 1/12/21; <br /> — "Engineering Drainage Calculations"; Prepared by: Gala Simon Associates, Inc.; <br /> Stamped and signed by: Alberto M. Gala, PE Civil No. 36434; Dated 11/3/2020 and <br /> revised through 1/12/2021 <br /> Mr. Richard Kirby, Wetland Scientist with LEC Environmental, and Mr. Al Gala, Project <br /> Engineer, presented before the Commission the changes made to the project description from the <br /> previous meeting. Mr. Kirby stated that the applicant is no longer proposing a crawl space <br /> beneath the addition and instead there will be an 18 inch by 18 inch access panel so insulators <br /> can access the addition space. Additionally, Mr. Kirby stated that the sump pump location was <br />