Laserfiche WebLink
Paul Finger presented before the Commission. He reviewed some changes made to the plans as a <br /> result of the Planning Board comments. <br /> Matthew Brassard presented before the Commission. He stated they conducted test pit <br /> excavations on Hartwell Place. The test pits revealed that, when the road was constructed, there <br /> was a 3 to 5 foot overburden that had been placed over the natural soils to construct the roadway. <br /> They put together a plan that shows the reconstruction of the replacement of the catch basin on <br /> Hartwell Place. This will lead to an infiltration trench along the south side of Hartwell Place <br /> Concerns of the Commission: <br /> - How did they deal with the change in flood storage with respect to the seasonal high <br /> groundwater table? The impression was they weren't going to change any physical <br /> grading under the building but just account for the higher water table and not count <br /> that as part of the storage. <br /> Responses of the Applicant: <br /> - They may have been under the incorrect impression during the discussion at the last <br /> meeting, they thought the Commission wanted them to build it up. They can go back <br /> to the original design. <br /> On a motion by Mr. Langseth and seconded by Ms. Samuels, the Commission voted 7-0 by roll <br /> call vote to continue the hearing until August 24, 2020 at the applicant's request. <br /> Record of vote as follows: <br /> Ruth Ladd—Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Duke Bisko —Aye <br /> Philip Hamilton—Aye <br /> On a motion by Kevin Beuttell and seconded by Ms. Dohan, the Commission voted 7-0 by roll <br /> call to adjourn the meeting at 9:32 PM <br /> Ruth Ladd—Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Duke Bisko —Aye <br /> Philip Hamilton—Aye <br /> Respectfully Submitted, <br />