|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-02-04-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2021
>
2021-02-04-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2021 10:02:01 AM
Creation date
3/11/2021 9:47:17 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
completed. Two temporary trail routes were suggested to provide a connection <br /> between the Land Locked Forest and Grove Street. One suggestion was a route using <br /> the easement from Wright Farm to Jefferson Drive and Jefferson Drive to reach Grove <br /> Street. The second suggestion was to route the trail along the eastern boundary of the <br /> Wright Farm property. GCC member Alex Dohan will bring the matter of temporary <br /> trail routings up at the next meeting of the Wright Farm planning group. <br /> • Concord Avenue - Brookhaven Loop Project <br /> The GCC is currently seeking direction from the Town Conservation Commission <br /> and Conservation Dept. on the best way to proceed in planning for a new trail from <br /> Concord Avenue to the Dept. of Conservation and Recreation (DCR) Beaver Brook <br /> North and Brookhaven residential properties. A land management plan for the Town <br /> Conservation property on Concord Avenue is needed and private funding from the <br /> Judy Record Trust may be available to contract out this work. Planning for this project <br /> has been complicated by non-permitted trail construction work done by residents of an <br /> abutting property. <br /> • ACROSS Lexington 10th Anniversary Celebration <br /> The GCC is considering possible ways the celebrate the 10th anniversary of the <br /> ACROSS Lexington trail system. GCC member Bob Hausslein has mapped out <br /> marathon length (26.2 miles/42.2 km) and half marathon length (13.1 miles/21.1 km) <br /> courses using ACROSS Lexington routes that could be used as part of the celebration. <br /> The tentative date for the celebration would be Fall 2021 if permitted by COVID <br /> pandemic restrictions. <br /> • ACROSS Lexington History Project <br /> Local resident Larry McCray has created a history of the ACROSS Lexington trail <br /> network based on the last ten years of GCC meeting minutes available on the Town <br /> website. How to use the history as part of the 10th Anniversary Celebration is being <br /> considered by the GCC. <br /> • Approval of a Motion to Adjourn <br /> All nine Committee members present voted in favor of adjourning the Meeting. <br /> The meeting was adjourned at 6:02 PM EST. <br /> Respectfully submitted by, <br /> Mal Crawford, GCC Member <br /> Rev. 1 2 March 2021 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.