Laserfiche WebLink
The Committee voted by a roll call vote in a straw poll to support the project (8-0-1). Mr. <br /> Pressman abstained. <br /> FY22 CPA Funding Request- Recreation- Park and Playground Improvements- South Rindge <br /> Avenue- Mr. Coleman requested $170,000 in CPA funds to update and replace playground <br /> equipment at the South Rindge Avenue Park, as part of the Recreation Department's annual <br /> program of park and playground improvements.The funds will also update and replace safety <br /> surfacing, install fencing, signage, park benches, trash receptacles, and the installation of a new <br /> bike rack. At the recommendation of a 2017 ADA compliance study the walkway leading to the <br /> playground will also be renovated to meet the minimum width requirements. The park <br /> equipment was last replaced in 2005 and typically lasts 15/20 years. <br /> Ms. Fenollosa asked if the ground surface is pour-in-place (PIP). Mr. Coleman stated that <br /> Lincoln Park has PIP and the most recent CPA funded project at Sutherland Park will have PIP. <br /> Mr. Coleman believes that there will be PIP at the main play structure and swing area and that <br /> PIP is going to be introduced more in the future. Mr. Horton asked if the renovated park will <br /> provide the same opportunities that the current park offers and if the playground will stay <br /> within the existing footprint. Mr. Coleman explained that the purposes and uses will remain the <br /> same. Ms. Battite explained that they have been working to engage the neighborhood for input <br /> and that Sutherland Park is a great example of this. <br /> The Committee voted by a roll call vote in a straw poll to support the project (9-0). <br /> FY22 CPA Funding Request- Recreation- Park Improvements-Athletic Fields- Muzzey Field- <br /> Mr. Filadoro requested $155,000 in CPA funding to renovate the Muzzey Field. The renovation <br /> will include irrigation upgrades, laser grading, and the installation of new natural grass. Two <br /> accessible paths, one on each side of the field will also be installed. Mr. Coleman stated that <br /> this project is part of an annual program to address safety and playability at the Town's athletic <br /> fields. <br /> Mr. Horton asked if the field is irrigated and how much money does the field generate. Mr. <br /> Filadoro stated that the field is irrigated and the system will be updated during the renovation. <br /> Mr. Coleman explained that Muzzey Field generates very nominal funds and that the field is <br /> most commonly used by soccer organizations. Mr. Langseth asked about the soil mix that will <br /> be used. Mr. Filadoro explained that soil samples will be sent to the lab but most likely a 2mil <br /> sand mixture will be used because it is good for growing grass, irrigation and is recommended <br /> by the United States Golf Association (USGA). <br /> The Committee voted by a roll call vote in a straw poll to support the project (9-0). <br /> 3 <br />