Laserfiche WebLink
8 <br /> -Proposed planting along the upper edge of wetland. Adding some native woody <br /> plants would speed along the transition to a woodier community. Will be added to <br /> the application. <br /> On a motion by Ms. Dohan and seconded by Mr. Beuttell, the Commission voted 6-0 by roll <br /> call to continue the hearing to the next meeting on October 19'', 2020 at the applicant's <br /> request. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> Continued Public Meetings/Hearings <br /> ViewPoint Cloud 4CNOI-20-21, DEP 201-1192 <br /> Notice of Intent, 3 Goffe Road <br /> Applicant: Lily Y Li Family Trust, Frank Hsieh and Lily Li, Trustees <br /> Project: Demolish in-ground pool and construct addition <br /> Previous Meeting Date: 9/21/2020 <br /> Documentation Submitted.- <br /> -Revised <br /> ubmitted:-Revised Plot Plan, prepared by Scott M. Cerrato, No. 50049, dated 9/30/2020 <br /> -Stormwater Analysis, prepared by Sullivan Engineering Group, LLC., John <br /> (Jack) D. Sullivan III, PE No. 41586, dated 9/27/2020 <br /> -Submittal Letter, submitted by Maureen Herald, Norse Environmental Services, <br /> Inc., dated 9/30/2020 <br /> Maureen Herald with Norse Environmental Services, presented to the Commission. Wetland <br /> flag IA had been adjusted 5 feet upgradient and the plan was revised to include the soil probe <br /> locations and flag change. This is now in compliance, per Michael Sprague, of the <br /> Engineering Department. <br /> On a motion by Ms. Samuels and seconded by Ms. Dohan, the Commission voted 6-0 by roll <br /> call to close the hearing. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br />