Laserfiche WebLink
The following items to be further evaluated as the project moves forward. <br /> 1. integrated design checklist. 6. Develop comps for Police. <br /> 2. Draft specs for saving the fagade. 7. Develop schedule Jan/Feb 2021 bid. <br /> 3. Start red list to save time later. 8. Obtain 2nd Estimate for comparison. <br /> 4. Submit three designs to HDC. 9. Soil testing to refine soil allowances <br /> 5. Schematic Design start soon 10. Develop cost model to assess systems <br /> Motion to adjourn was made and seconded: Meeting adjourned <br /> PBC Meeting 01.09.20 3 <br />