Laserfiche WebLink
C. Location was discussed again. The 173 Bedford Street location will be reopen for <br /> discussion. <br /> PBC: Some members feel that looking at 173 Bedford location again is wasting time and money. <br /> Three options from a June 2017 meeting were to be reviewed by the Select Board. <br /> • 173 Bedford - $22mil. <br /> • 173 Bedford (expanded) -$27.6mil. <br /> • 1575 Massachusetts Ave. (current location) - $25.5mil. <br /> It was not felt that the project would make the ATM this year. Thought is to keep working on red list <br /> and some spec items. <br /> There is a desire to bring projects to Town Meeting when they are substantially finished with <br /> Construction Documents ie when the cost estimate better predicts the bid. There are however times <br /> when schedule suggests bringing projects to Town Meeting in Design Development or early <br /> Construction Documents. Jon H. stated it may make sense to get a check estimate on the police <br /> station since this project will not be substantially completed with CDs in time for a Special Town <br /> Meeting (STM) in the fall. This tactic would help to avoid schedule slippage. <br /> Jon H. suggested that the Hosmer House building is not isolated, and the police design needs to be <br /> considered with the context of the campus; its location near the Town Office Building and Cary <br /> Memorial Hall. Discussion was brought up about moving the Hosmer House up to one mile, and its <br /> impact on the budget. <br /> It was stated the HDC was never asked about demolishing the whole fagade of the existing police <br /> building. Guidance is needed on how/who gets say on the two walls in question and has approval <br /> authority. <br /> PBC suggested that two HDC members should be talked with, about this decision, how it gets made <br /> and abilities to evaluate options. <br /> Dick P. stated that from his experience, if HDC does not sign off then the project is stopped. <br /> However, there is an established appeals process. <br /> Phil C. suggested that three design options be given to the HDC so we can move the project <br /> forward. In reference to the upcoming Select Board Meetings it was asked if Mr. Coleman was <br /> available to attend. <br /> Mark C. stated the current police building is not code compliant, (i.e. no elevator, no ADA), and if the <br /> police move out, who could move in? <br /> A resident attending tonight's meeting asked about having a chart of comparable police stations and <br /> their needs, sizes and costs. Others indicated agreement to this suggestion. <br /> It was discussed that the Schematic Design be checked for inclusion of the LEED Checklist scope, <br /> i.e. air, filters, etc. <br /> PBC Meeting 01.09.20 2 <br />