|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-09-21-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2020
>
2020-09-21-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2020 5:39:24 PM
Creation date
11/17/2020 5:39:21 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> ViewPoint Cloud 4CNOI-20-24, DEP 201-XXXX <br /> Notice of Intent, 43 Sanderson Road <br /> Applicant: Evan Freeman <br /> Project: Construction of an expanded deck within the 100 foot Buffer Zone from a Bordering <br /> Vegetated Wetlands <br /> Previous Meeting Date: 9/8/2020 <br /> Additional Documents Submitted: <br /> -Peastone Expansion,prepared by Wetlands Identification, dated 912112020 <br /> -Buffer Zone Restoration Plan,prepared by Wetlands Identification, revised and <br /> dated 91812020 <br /> David Sperduto from Wetlands Identification presented to the Commission, noting that there is <br /> still no DEP number. Mr. Sperduto wanted to clarify that they are proposing a deck on the back <br /> of the house and no longer proposing the expanded peastone area. Mr. Sperduto also pointed out <br /> the benefits of the proposed landing, including a break in the fifteen steps for safety and that <br /> other configurations would require additional and more expensive piers. Applicants Evan <br /> Freeman and Michelle Yannetti raised concern about adding peastone on the downslope. <br /> Krisoula Varoudakis, designer for the applicant, also spoke to the Commission. <br /> Concerns of the Commission: <br /> -Cautions the applicant to be sure the dimensions have been carefully laid out and are not only <br /> schematic. <br /> -Does not want the stairway to end any closer to the wetland. <br /> Responses of the Applicant: <br /> -Fine with a condition for 3 feet of peastone at the bottom of the stairs. <br /> -There may be an additional tread. Measurements were taken off elevation of existing door. The <br /> rise and run were configured from that, but there was snow on the ground. <br /> -Can retain current distance from wetland edge by adding one of the treads to the top rise. <br /> On a motion by Mr. Langseth and seconded by Ms. Samuels, the Commission voted 7-0 by roll <br /> call vote to continue the hearing to October 5, 2020 for the purpose of retrieving the DEP <br /> number. Mr. Sperduto is not required to attend this meeting. <br /> Record of vote as follows: <br /> Duke Bitsko —Aye <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br />
The URL can be used to link to this page
Your browser does not support the video tag.