|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-03-00-CPC-ATM-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Community Preservation Committee-CPC
>
Minutes
>
2020
>
2020-03-00-CPC-ATM-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 11:29:20 AM
Creation date
3/12/2020 11:29:36 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
2020 ATM - CPC Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proj ect: <br />CPA Category: <br />Amount Requested: <br />Amount Recommended: <br />CPC Vote: <br />Project Description: <br />ARTICLE 10 (c) <br />Battle Green Master Plan- Phase 3 <br />Historic Resources <br />$ 317,044 <br />$ 317,044 <br />The Battle Green Master Plan was first presented to the Board of Selectmen in March, 2010, and <br />the Master Plan Implementation has been broken out into three phases. Phase 1 was approved at <br />the 2011 Annual Town Meeting to repair and upgrade the pathways surrounding the existing <br />monuments on the Battle Green. Phase 2 was approved at the 2012 Annual Town Meeting for <br />repairs and upgrades to the pathways surrounding the Battle Green itself and Belfry Hill, and for <br />rehabilitation of the granite steps leading to the Obelisk and the fence at Ye Olde Burying <br />Ground. Phase 3 was approved at the 2019 Annual Town Meeting to address site amenities, the <br />Old Belfry, and historic monuments. The FY20 project request was originally in the amount of <br />$570,438, but due to CPA funding constraints in FY20, the funds requested were reduced to <br />$253,394, with some of the site improvements deferred to FY2 L This request funds that deferred <br />work. Phases 1, 2 and half of Phase 3 have been funded, with work scheduled for fall 2019 and <br />spring 2020. Funding for Phase 3 construction will be used to address site amenities and <br />remaining pathways, monument restoration, lighting installation and historical landscaping. <br />Project Goals and Objectives: <br />• Provide a safe, accessible, and well maintained outdoor area for community use; <br />• Work with the Lexington Field and Garden Club to restore the historical landscaping; <br />and <br />• Complete the Battle Green renovations before the 250th anniversary of the Battle of <br />Lexington and Concord. <br />Project Benefit: <br />There is a community consensus that there needs to be design consistency in the Battle Green <br />area because of the prominence of the site and its national and local historic importance. The <br />elements that exist in the Battle Green need to be maintained, updated and restored in order to <br />keep them viable for current and future generations of residents and tourists. This project reflects <br />the goals, and incorporates the recommendations, of the 2010 Master Plan. <br />Funding Request: <br />$317,044 is requested for FY21. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.