Laserfiche WebLink
1775R" TOWN OF LEXINGTON <br /> v � � <br /> m_ Permanent Building Committee <br /> Qk <br /> N W Z V D <br /> a0 <br /> Z Permanent Members <br /> s <br /> APRIL19TIl Co-Chairman: Jon Himmel &Co-Chairman Dick Perry <br /> �xI"�'`� Philip Coleman, Charles Favazzo, Carl Oldenburg, Peter Johnson, Howard Hobbs <br /> Project Specific Members <br /> Clarke&Diamond Schools Hastings Elementary Fire Station Visitors Center LCP LCC <br /> Margaret Coppe Curt Barrentine Robert Cunha Joel Berman Teresa Hank <br /> Edwin Goodell Andrew Clarke Joseph Sirkovich Peter Kelly Wilson Manz <br /> May 02, 2019 <br /> Members Present: Jon Himmel, Dick Perry, Philip Coleman, Charles Favazzo, Peter Johnson <br /> DPF Staff: Mike Cronin/Director of Public Facilities, Mark Barrett, Ann Marie Ponzini <br /> Board of Selectman Representative (BOS): Jill Hai, Mark Sandeen <br /> Capital Expenditures (CEC): David Kanter Appropriation Committee (AP): Glenn Parker <br /> Sustainable Lexington Committee: Dan Voss, Celis Brisbin <br /> Lexington Police Department (PD): Chief Mark Corr <br /> The Green Engineer (TGE) and Tecton Architects <br /> 6:10 PM- The meeting was called to order— 201 Bedford Street, Cafeteria. This meeting is being <br /> recorded by LexMedia. <br /> 1. Police Promect Integrated Design Discussion — Jon Himmel (PBC) <br /> Jon reviewed tonight's agenda and introductions were made. Chris Schaffner of The Green <br /> Engineer was introduced as the consultant to the town assisting in the Police Project Integrated <br /> Design Discussion. <br /> Chris S. understands his role is to be a facilitator to the Police Station Project, and the Design <br /> Process. <br /> General Project Information <br /> • Project Schedule: The final project schedule is still in progress. The team discussed adjusting the <br /> schedule to better support integration of sustainability goals. The schedule may follow the timeline <br /> below: <br /> o SD Phase: May -July 2019 <br /> o DD Phase: August - October 2019 <br /> o CD Phase: End of October 2019 - mid February 2020 <br /> o Construction: July 2020 - September 2021 <br /> • The new Lexington Police Station will replace the existing building and may include the new IT Data <br /> Center. The project team is currently considering several designs for the new building. The building <br /> will be two-stories, the area will be approximately 32,000-35,000 sf. <br /> • The primary project goals pertain to security, energy, resilience, and indoor environmental quality. <br /> • The new building's exterior will keep the historical fagade of the existing building. The project will <br /> either reuse the existing fagade, or a new identical one will be constructed. <br /> 201 BEDFORD STREET• LEXINGTON, MASSACHUSETTS 02420 <br />