Laserfiche WebLink
Ms. Buczynski confirmed. <br />Mr. Langseth asked if they have conducted hydraulic testing. <br />Ms. Buczynski stated that they have modelled it through HydroCAD. <br />Mr. Langseth raised his concern about whether the test modelled to predict how much force <br />the flow would provide and if it was able to lift the top off of the grate. <br />On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 7-0 to <br />continue the hearing until October 1, 2019 at the applicant's request. <br />Bpm <br />DEP 201-1150 BL 1106 <br />NOI Hearing, 3 Patterson Road <br />Applicant: Duggan and Sons <br />Project: Raze and rebuild of a single family dwelling <br />Mr. William Hall and Mr. Chris Duggan presented before the Commission. Mr. Hall <br />presented the proposed raze and rebuild of the existing single family dwelling. There are two <br />gravel driveways on the property. They wish to rebuild the dwelling using the existing <br />foundation which is a slab on grade. There is a proposed rain garden. The gravel driveways <br />will be removed. <br />Chairman Hamilton read the engineering memo into the record. <br />Mr. Beuttell asked what the gravel driveways will be replaced with. <br />Mr. Hall stated that they will be replaced with loam and seed. <br />Mr. Bitsko asked what the highest drop will be from the retaining wall. <br />Mr. Hall stated that the retaining wall will be at the tallest two feet. <br />Mr. B itsko asked if there was anything preventing the rain garden from overflowing onto the <br />neighboring property. <br />Mr. Hall stated that there is a swale. Grading for the swale will be provided. The operations <br />and maintenance plan will be revised. <br />Mr. Sal Pace, an abutter, voiced his concerns regarding the current state of demolition of the <br />dwelling as a point of safety for the neighborhood. <br />