|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2019-09-03-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2019
>
2019-09-03-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2019 1:00:08 PM
Creation date
11/5/2019 12:59:49 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On a motion by Mr. Wolk and seconded by Mr. Beuttell, the Commission voted 7-0 to issue a <br />negative determination with conditions. <br />7:05pm <br />DEP 201-1107 BL 1065 <br />Amendment to Order of Conditions Hearing, 17 Banks Avenue <br />Applicant: Pengcheng Zhou <br />Project: Amend Order of Conditions to include dry well and grading changes that impact <br />drainage <br />Mr. Deshang Wang presented before the Commission. <br />Mr. Wang stated that they have eliminated the retaining wall. The groundwater separation and <br />the recharge galley remained the same. The proposed amendment results in less impact than <br />the request for insignificant plan change. An operations and maintenance plan is not <br />applicable since the retaining wall was eliminated. There is no backflow anymore on the <br />property. <br />Chairman Hamilton read the engineering memo into the record. <br />On a motion by Mr. Beuttell and seconded by Mr. Langseth, the Commission voted 7-0 to <br />close the hearing. <br />7:07pm <br />DEP 201-1151 BL 1107 <br />NOI Hearing, 21 Revere Street <br />Applicant: Ernest Rogers <br />Project: Raze and rebuild of a single family dwelling <br />Mr. John Rockwood and Mr. Bob Bibbo presented before the Commission. Mr. Rockwood <br />presented the proposed single family dwelling and stormwater system within the 200 <br />riverfront riverfront area. <br />Chairman Hamilton read the engineering memo into the record. <br />Mr. Bibbo addressed the engineering comments and will provide additional details. <br />Chairman Hamilton noted that Mr. Bibbo will have to contact the Engineering Department to <br />resolve the comments. <br />Mr. Langseth stated that in regards to the two feet of separation, Dr. Chiang, the project <br />engineer needs to clarify the existing grades and proposed infiltration system. Mr. Langseth <br />asked if a hydraulic analysis was submitted to provide greater detail on the sump pump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.