Laserfiche WebLink
Mr. Kirby stated that gravel that will be installed will have a void ratio which will be greater <br />than the current soils that are there. The project overall has a net increase of 50 cubic feet for <br />flood storage. <br />Mr. Langseth stated that though the Engineering Memo states that the applicant is not in <br />compliance with the engineering standards for conservation, he believes that the project may <br />be considered in compliance because the only stormwater being managed in the patio area is <br />the precipitation that falls on the patio. <br />Mr. Kirby inquired about the possibility to "bank" the flood storage acquired in this project <br />for the larger project the applicant proposes to apply for in the future. <br />The Commission decided to not comment on that idea at this time. <br />On a motion by Ms. Ladd and seconded by Ms. Dohan, the Commission voted 7-0 to close <br />the hearing. <br />DEP 201-X BL X <br />NOI Cont. Hearing, 7 Lois Lane <br />Applicant: William Keim <br />Project: Construction of deck and patio <br />Ms. Cerise Jalelian presented before the Commission the supplemental information that the <br />Commission had asked for. <br />On a motion by Mr. Wolk and seconded by Ms. Dohan, the Commission voted 7-0 to close <br />the hearing. <br />DEP 201-968 BL 926 <br />Amendment to an Order of Conditions Cont. Hearing, Rangeway Extension and SFH Lot <br />Applicant: Suzanne Raymond <br />Project: Construction of a roadway, retaining wall and single family dwelling <br />Mr. Fred Russell and Ms. Raymond presented before the Commission. <br />Chairman Hamilton read the engineering report into the record. <br />Ms. Mullins stated that the applicant will have to go before MassDEP again to have this <br />project approved. <br />Mr. Eric Wilker, an abutter, mentioned a proposed storm drain to be replaced which has a <br />pipe beneath it. Mr. Wilker asked that the pipe be replaced. <br />The Commission discussed the potential merits of replacing the pipe. <br />