Laserfiche WebLink
14 <br /> THIS AGR.MSE24T made this eighth day of September, 1902, by <br /> and between_ the Town of Lexington (acting by its 111igh School House <br /> Building Committee) , hereinafter called the Town, and J. Lawrence <br /> Carney, of Boston, herein called the Cortracl�or, WITYESSETH as fol- <br /> lows: <br /> In consideration of the agreements on the part of the Town- <br /> herein contained, the Cont ctor hereby undertakes and agrees to <br /> furnish the labor and mat.. ,* or do the work of, grading <br /> and planting the lot where ; to _ W Ti h School Building in Lex- <br /> ington is situated, all wo -o be done in conformity with the <br /> plans and specifications therefor prepared by Cooper & Bailey, <br /> Architects, the s9a: E: being E2reb;; referred to and made part hereof. <br /> For identification they ar initi led by? the respective signers <br /> hereof. <br /> The work contracted f inc es t e construction of drive- <br /> ways , gutters , sidewalk, and retaining gall, all as indicated on <br /> plan or called for in the sp cificati .a; and this work as well as <br /> everything required by the > ._z� s and cifications shall be done <br /> to the satisfaction of the 'iitec t d Building Committee. <br /> The agreed price for the c;mpl ed job , including the plants <br /> and shrubs to be furnished and l.anted by the Contractor is the <br /> sum of Twelve Hundred Doll.a s % 120 ayable as below provided; <br /> and the Contractor agrees have the b finished ( sage only as <br /> the specifications require _ or p, r after the substantial <br /> original completion of the won later than the fifteenth day <br /> of Ootober, 1002, as to everything except the Planting, and to have <br /> that all done by the fifteenth day of November, 1902. <br /> The Town agrees to accept the work vdien completed and to pay <br /> therefor said sum of Twelve rzundred Dollars C#�1200) , and to make <br /> the payment in instalments as follows, viz: at the end of each <br /> week 80,0 of the value (determined by the Architects) of the work <br /> then already done, an accumulating reserve to be held back until <br /> l <br />