HomeMy WebLinkAbout2769 Report, Committee on Water Supply, no date but presumed 1902The Committee on Water Supply present the following
report of progress made by them in matters committed to their
charge.
At the annual meeting in 1900 the motion being made that
the town take measures to enter the Metropolitan Water System, it
was voted that the whole matter be referred to a committee with
instructions to act with the water commissioners and investigating
the subject, and to report at a subsequent meeting.
The committee unanimously reported in print at the
annual meeting in 1901. At that meeting the sewer commissioners
were added to the committee, and enlarging it to eleven members, and
the committee was instructed to continue their investigations and
to experiment for an additional water supply. One thousand dollars
was appropriate for such experiments.
At a special meeting held September 12, 1901, the committee
reported the progress of the work with recommendations. Said report
being now in print with the town reports.
The committee was instructed by vote to continue their
investigations, to complete the work begun, and to carry out such
other measures as were adopted at the meeting.
The committee recommended the completion of a well now known
as well No.7, the construction of an additional well to take in the
Beaverns Spring, known as well No. 8, the construction of a water
tight basin for the collection of water from the different source sources
and the connecting of these works with the pumps by a large suction
pipe.
The town appropriate ten thousand dollars for the above
purposes. Mr. L. H. Hawes, the engineer whose communication was
appended to the report, appeared before the committee and after a
long consultation was employed as engineer and to superintend the
work.
Under his directions the committee advertised for sealed pro-
posals for doing the work. Five proposals were received and the con-
tract was awarded to T. Stewart & Son Company of Newton.
Owing to unavoidable delays this contract was not made until
about the middle of October, and the continued dryness of the season
made it important to husband water from all our sources of supply and
not to disturb the Beaverns Spring until considerably later, so that
most of the work has been done under adverse conditions and it is not
fully completed.
Well No. 6 is completed, the section pipe is laid and wells
No. 6 and 7 are connected with the pumps, but the collecting basin
is not finished, the severity of the weather rendering it impracticable
to work with cement or to complete the grading. As soon as spring
opens the work can be finished in a very few days.
The committee deemed it important to have all parts of the
work done under constant supervision. The difficulties which the con-
tractor met, owing to the character of the land, the scarcity of labor
and the abundance of water and unfaithful plumbing doubled the time it was
estimated it would take to do the work and very materially added to the
cost of supervision, so that the entire expense will exceed the appro-
priation made by the town and an additional appropriation of
two thousand two hundred fifty dollars will be required.
The supervision of the work has been very rigid, we are con-
fident it has all been well done and that it will accomplish everything
suggested in our report.
The supply of water from well No. 7 which is an entirely new
source, is fully up to the amount expected.
Some of the committee have been very confident for years that
a very much larger quantity of water would be obtained from the sources
of the Seaverns Spring by enlarging the excavation in depth and diameter,
or by sinkng a deep well similar to our present deep well No 5.
The engineer was not as sanguine as the committee. He thought
the quantity would be increased but that this increase would result
from direct pumping, by keeping the seams in the rock free and by re-
moving the pressure of the bulk of water which must otherwise stand
above the openings and as the basin was too small to pump from, it
was wise to enlarge it to the capacity of well No. 7. As above stated
this has been done. The quantity of water we are now getting from it
is without doubt larger than before, but probably only in the manner
suggested by the engineer.
The strongest claim made by the engineer and by the committee
was that the water from the deep well, from the reservoir wells, from
the reservoir when it was necessary to use it, and from wells Nos 6
and 7, being all collected in a water tight receiving basin instead of
in the open wells Nos. 1 and 2 with their loose connections, we should
save a very large amount of water which has hitherto run to waste, and
that the water from all these sources, which is excellent, would not be
contaminated or discolored by rain or Meadow water or surface drainage.
Both of these evils, evident to any one who will give the matter even
slight attention, we believe will now be removed and that the quantity
and purity of the water will be conserved.
We regret that the collecting basin was not finished so
that we might have had a practical demonstration of the results before
this meeting. As an indication of what we may expect, we recall
that early in February for a considerable time the water distributed
to the town was pumped largely from wells No. 6 and 7. During this
time the water was fine, sparkling and colorless. Since the heavy
rains wells No. 1 and 2 have been full so that we are now pumping
from these wells alone and the water is highly colored.
Carrying out the instructions of the town we experimented
during the dry season with wells driven into the woods northwesterly of
well No. 6. Six of these wells were connected above ground with
portable steam pump, and pumped several days, a few hours each day,
the boiler being required for other work the pumping was discontinued
and owing to the weather we have not had an opportunity to resume it.
The water from these wells comes from a stratum of gravel resting on
the ledge about 30 feet below the surface. The water is cool and clear
and appears to be good. The superintendent of our works, who did t
he pumping, estimated that we obtained at the rate of upwards of
50000 gals. per day.
While we were laying the section pipe such an enormous
quantity of water boiled up through the mud that we thought it ad-
visable to drive other wells in that locality. The experiment
showed that there was an abundance of water between the gravel
stratum and the surface but of a quality unfit for domestic purposes.
Driving through this into the gravel we found sufficient of apparently
good quality to justify connecting them and giving them a pumping
test. Pipe for this purpose was obtained and is now on the ground,
but the recent storms have prevented our continuing the work. The
design is to connect ten more wells already driven and showing a con-
siderable yield, with the six already connected, to pump these night
and day for a week or more, make frequent analysis of the water, and if
the supply continues and the water is found to be good, to permanently
connect these wells with the suction pipe, so that we may pump from
all of them at the same time we are pumping from the new wells, Nos. 6
and 7.
If these wells yield only a few gallons each per minute it
will be readily seen that the aggregate from sixteen or more will be
a considerable addition to our supply.
Although we had already nearly exhausted the appropriation
for experimental work, we felt justified in going on with the ex-
periments so that the connections might be made before the contract
work was completed.
pumped night and day four months, almost 3000 gallons per hour.
During a considerable part of the year it flows at the
surface without pumping. At the present time it is flow-
ing naturally about six gallons per minute. This apparently
indicates that its sources, or some of them at least, are not
from the surrounding meadow but from a higher and perhaps distant
elevation.
The committee have for a long time had considerable con-
fidence that it is possible to obtain our larger quantity of water
from this well then we have thus far been able to get.
It is well known by the town that we are now using on this
well the Bacon Air compressor and it will be remembered that in a
previous report we detailed the result of our experiment with the
Pohle Air Lift, made with the hope that we might obtain better
results. The experiment showed that the Bacon method produced
better results and we replaced the apparatus. Since that time we
have had so much demanding our attention that we have made no
further experiments, and, in fact, we rely so largely on this well
it is impracticable to experiment with it excepting in the spring
months when we have sufficient water without using it.
It is well understood that the Air Lift methods require a
two thirds submergence, that is, we can lower the water in a well by
this method only about one third of its depth. Our well is nearly
200 ft deep and we probably lower the water by continuous pumping
not over 75 feet. It is believed that water flows into this well
from seams in the rock extending all the way down to the bottom itself.
Several reliable firms claim to make deep well pumps that will
not only lift the water from any reasonable depth but also at the same
time force it to a considerable height. It is claimed to be practicable
to pump from the bottom of our well and at the same time deliver the
water into our stand pipe. These manufacturers claim that their
pumps are of efficient capacity to deliver at the surface from any
deep well from 2 to 4 times the quantity that can be obtained from the
same well by the Air Lift methods, and at less than half the cost per
gallon.
One large concern offers to furnish and set up a pump which is
guaranteed to be a sufficient capacity to furnish 10000 gallons per hour
for $1000, and to pump that amount of water from our well or pump the
well dry. And if after a trial it is found not to come up to the
guaranty, or if the water gives out, we can return the apparatus,
paying only the cost of the experiment, about $200.00.
The town has an investment in its water system of upwards of
$250000 and we feel that as a business proposition it is wise to
spend a considerable amount in trying all reasonable plans that may
be suggested to protect that investment before relinquishing it.
The report thus far refers only to the work done on the town's
land in the vicinity of the present pumping station.
At the meeting in September last the Committee reported the
result of its experiments in the Roberts Meadow. Five of the driven
wells referred to in that report were afterwards connected, a temporary
boiler and pump set up, and under the direction of our superintendent
pumped for several weeks, the last ten days being continuous, night
and day, and under the direction of the State Board of Health. Samples
of the water were sent every day to the State Board.
The analyses show a slight trace of chlorine, and this also
slightly increased as the pumping proceeded. They claim that this
indicates animal impurity and the possibility of more serious contam-
ination at sometime in the future, perhaps from animal manures spread
on distant fields. But the water at the present time is remarkably
pure for groundwater and suitable for a domestic supply. They also
expressed some doubt as to the quantity of the supply in a very dry season.
They do not however condemn the project, although
it is evident they are desirous to have us join the Metropolitan System.
7
As to the quantity of water the engineers who are ready to
contract with the town as we last reported have no doubt. Mr. Bruce
reports he pumped during the last days of the test upwards of one hundred
gallons per minute or at the rate of about 150,000 gallons per day
from the five wells connected, and that the water was lowered by the
pumping only eleven and 2/3 feet below the surface. These wells extend
only a third of the distance across the supposed water basin in the meadow
referred to. It is proposed to extend them across the whole basin,
and there seems to be a little doubt that the capacity within reasonable
limits is determined only by the number of wells used.
The five wells furnished nearly or quite half as much as
we are now using daily. It is easy to estimate the probable
amount to be obtained two or three times this number. It seems
hardly possible that this source would not be sufficient for many years
to supplement the present sources during dry seasons.
The committee was instructed to petition the Legislature for an
act to authorize the town to take land and water sources in this locality
and to negotiate with the land owners for the purchase or lease of suf-
ficient land for the required purposes.
An Act of the Legislature has been obtained and the town has
now authority to act whenever it is deemed expedient. It was not
deemed advisable to approach the land owners until the Act referred to
was enacted, and this has been so recently done the committee cannot
report further at the present time. They recommend no action on this
matter at this meeting.
For the purpose of completing the work already in hand and for
further experimental work above suggested we recommend an appropriation
of four thousand dollars ($4000).
Geo. W. Whiting
Frank D Brown
Emmett S. Locke
J. Odin Tilton
S Myron Laurence
Robert P. Clapp
A. E. Scott
Nathaniel H. Merriam
James Elerone[?]
Chas. W. Swan
Boston, Mass, March 10, 1902.
Lexington Water Committee,
Mr. A. E. Scott, Chariman,
Dear Sir: -
I have the following report to make on construction progress of
the new work at the pumping station. Owing to the lateness in starting and
the very unusual weather during the month of November last which pre-
vented the rate of progress usually expected in that month, the work
could not be completed in December as planned, thus forcing construct-
ion into the winter season when masonry work could only be carried on at
favorable stages of the weather. However, the work has been prosecuted
with considerable persistency and at the present time both wells have
been completed, the section pipe laid and connected with the pumps, the
collecting basin which is to take the clear water from the deep well,
the reservoir wells and the overflow from the two new wells has been
built, roof over, plastered inside and the last layer of concrete on
the bottom is now being put in. The necessary pipe connections with
this basin have been made and the only work remaining to be done is the
filling outside the wall, and some grading at the basin and wells and
on pipe line, which can be accomplished when the condition of the ground
will permit.
As soon as the filling outside the basin wall is done and the plas-
tering and concrete have set sufficiently the collecting basin will be
ready for use. The two wells are already in operation, measurements of
pumping from them alone on the two days recorded resulting as follows:-
On one day, pumping at intervals during the period of 10 hours between
9:30 AM and 7:30 PM 96,360 gallons; on the other day, pumping
at intervals during the same time 82,425 gallons.
March 10 4 pumpings beginning at 9 AM 101,000 gals.
-2-
During a 24 hour period there would of course be considerably more pumped.
The water in well No. 7 will rise about 1 foot higher than in the
original spring, and in No. 6 the Seaverns Spring, 3 feet higher than
before and can be draughted to a point of 10 feet deeper than originally.
In addition to the above work, investigation for a ground supply
of water from a system of driven Wells has been in progress and some
fourteen wells are down at a place where connection can be made with the
suction pipe to the two new dug wells and pumping and then occur from
all and the collecting basin at the same time. These wells penetrate
through a strtum of clay into a gravel stratum beneath and take water
at depths from 26 to 33 feet below the surface. Six of these wells were
connected temporarily above the surface and pumped from for a while, the
water being delivered into well No. 2 materially aiding in the supply to
the town. The balance are to be similarly connected and the whole
tested for quantity and quality before being connected permanently below
the ground with the main pump suction.
With a tight collecting basin for receiving the water as pumped from
the deep well, it will be possible to determine the yield of that well
and ascertain the relative economy of different methods of pumping its
water. It will also be possible to clean out wells 1, 2, 3 and 4 and do
the necessary work for protecting them from the highly colored surface
water which now gets in; and it will be possible to determine their
yield.
After the original wells are thus improved and furnished clear water,
it is possible that in case additional water is required at any time, to
be taken directly from the storage reservoir, it could be improved by
passing through the filters already installed at the station provided
-3-
the quantity were not too great. To do this would require some change
in the filtering material, a thorough overhauling of the apparatus and
intelligent handling. When necessary to use the stored water even if
not filtered, it can be economized by draughting direct from the reser-
voir or first receiving it into the collecting basin, instead of into
well No. 1 as was the practice last summer, when doubtless the major
portion of it was lost into the ground.
I would respectfully recommend as an aid to securing greater econ-
omy and better results in handling the entire water supply and work in
connection with it, that complete daily records be kept in a way that
will enable tabulation and comparison of the height of water, sources
drawn from, coal consumed, hours of pumping, pump operated, condition of
water etc. etc.; no records being now kept that I am aware of. Such
information would also facilitate the early discovery of defects and
enable application of the proper remedy.
Very respectfully,
Louis E. Hawes
Lexington W. W.
Progress Report
March 10 1902
Louis E. Hawes
2769