Laserfiche WebLink
5 <br /> NOI, 758 Marrett Road <br /> Applicant: Minuteman Vocational High School <br /> Project: Construction of synthetic tuft athletic fields <br /> Previous Meeting: 2-25-2019, 3-25-2019 <br /> *Request to continue to Monday, 4/22/19 at 7:00 PM <br /> On a motion by Ms. Ladd and seconded by Mr. Beuttell, the Commission voted 6-0 to continue <br /> the hearing until Monday, April 22 at the applicant's request. <br /> DEP 4 201-1126 BL 1083 <br /> NOI, 6 Blinn Road <br /> Applicant: Lauren Dillon <br /> Project: Proposed raze and rebuild of a single family dwelling <br /> Previous Meeting: 3-11-2019 <br /> Ms. Lauren Dillon and Mr. Wesley Leighton presented before the Commission. Ms. Dillon <br /> presented a new plan for a single family residence informally to the Commission. The new <br /> proposed dwelling eliminates the proposed deck and is placed in the same footprint of the <br /> existing dwelling. The amount of impervious surface area has decreased by almost 50%. <br /> Ms. Dohan asked if they were keeping the existing foundation or constructing a new one. <br /> Ms. Dillon stated that they will be constructing a new foundation. <br /> Mr. Beuttell raised serious concerns regarding the second wetland delineation which was <br /> drastically different than the first delineation and is still missing completed data forms. Mr. <br /> Beuttell suggested that a peer review be conducted. <br /> Mr. Bitsko inquired about the test conducted during the site visit. Mr. Wolk stated the tests were <br /> spotty and Ms. Ladd stated that the ground was very wet. <br /> Ms. Mullins suggested as an alternative that she can conduct soils tests with the wetland <br /> scientist. <br /> Mr. Wolk stated that, regardless of the potential confirmed wetland delineation, the proposed <br /> house will continue to have issues such as the stormwater management effects of an increased <br /> dwelling elevation. <br /> Mr. Langseth stated that stormwater management will be difficult because of the high ground <br /> water table. <br /> The Commission agreed that the next step is for Ms. Mullins to arrange a site visit with Mr. <br /> Crossman, the wetland scientist, in order to conduct soil tests. If the site visit does not produce a <br /> definitive delineation or unsatisfactory results, an outside consultant will be brought in to <br /> conduct a peer review at the applicant's expense. <br />