Laserfiche WebLink
3 <br />BOARD OF APPEALS <br />List of Public Hearings by Address 1986-1996 <br /> <br /> <br />12 Baskin Rd., Francisco & Arlyn Silva-Tulla. A variance from dimensional <br />controls was granted to allow an addition to be constructed. Hearing 6/19/86 <br /> <br />Interchange Bedford St./Route 128, Lexington Department of Public Works/Engr. <br />Variances from side and rear yard setbacks to replace North Lexington Pump Station <br />were granted. Hearing 3/21/91 <br /> <br />7 Bedford St., Julie Schauman. A three-year special permit for the continued <br />use of a home office 15 hours a week was granted. (Expires 6/22/94) Hearing <br />5/16/91 <br /> <br />7 Bedford St., Julie Schauman. A two-year special permit for a psychotherapy <br />office in a residence was granted. (expires 6/22/91) Hearing 6/22/89 <br /> <br />7 Bedford St., Julie Schauman. A special permit for a home office was renewed <br />for five years. (Expires 6/22/99) Hearing 7/14/94 <br /> <br />39 Bedford St., Bank of Boston. A request to modify a special permit to convert <br />one auto service bay to a 24-hour ATM was denied. Hearing 1/26/89 <br /> <br />39 Bedford St., Bank of Boston. The Board determined that the proposed addition <br />of an automatic teller machine at a gasoline service station is not a minor revision <br />to the special permit and a public hearing is required. Hearing 11/10/88 <br /> <br />39 Bedford St., Bank of Boston. A request to allow a denied petition to be <br />resubmitted before two years was granted. Hearing 6/8/89 <br /> <br />46 Bedford St.,Shell Oil Company. A special permit for an internally-illuminated <br />free-standing sign at the Battle Green Shell station was granted. Hearing 3/23/95 <br /> <br />46 Bedford St., Shell Oil Co. A variance from the front yard setback to install <br />a canopy at Battle Green Shell was granted. Hearing 4/29/93 <br /> <br />46 Bedford St., Shell Oil Co. A special permit for additional signage on the <br />canopies at Battle Green Shell was granted. Hearing 4/29/93 <br /> <br />46 Bedford St., Shell Oil Company. A special permit was modified to allow an <br />addition to the Battle Green Shell Station for the sale of convenience goods and <br />to increase the parking capacity. Hearing 6/20/91 <br /> <br />46 Bedford St., Battle Green Shell. A special permit was modified to enlarge <br />the building within the footprint and for take-out food service. Hearing 4/28/94 <br /> <br /> <br />53 Bedford St. (53-55), A & D Realty Trust. A variance from dimensional controls <br />was granted to enclose a loading platform on a commercial building. Hearing <br />11/20/86 <br /> <br />57 Bedford St., Lumberyard Realty Trust. A petition for variances from develop- <br />ment standards in the CRS District was withdrawn with the Board's approval. <br />Hearing 8/24/89 <br /> <br /> <br />