Laserfiche WebLink
Conversation related to the addition of a Crematorium discussed it being an addition versus a <br /> possible separate building. Additional costs associated with adding/building a Crematorium, and its <br /> needs, were also briefly discussed. Further study is needed. <br /> Appropriation and Schedules <br /> Justin: Current appropriation covers everything in his fee for CDs, bidding and other associated soft <br /> costs. The project would need to be back to town meeting for a hard cost discussion. Justin <br /> anticipated he will have 90% docs for the meeting around March 10th 2019. The design process is <br /> not put on hold for any appreciable time. He is currently finishing schematics. <br /> PBC: Stated a schedule of the design phase still needs to be done as requested at the prior <br /> meeting. The PBC asked that 4 high level schedules be prepared showing each of the design <br /> phases; [programing, schematics, design development, construction, bidding, construction, <br /> occupancy, plus Town Meeting funding approvals (if needed)]. <br /> 1. Proceed with the current design with only a notion of a crematorium. <br /> 2. Proceed with the current design with a standalone crematorium on a separate schedule. The <br /> separate crematorium would probably be outside the current article language, and therefore <br /> require an all new RFP process. <br /> 3. Proceed with the current design while making other accommodations for a future <br /> crematorium addition. <br /> 4. Develop an all new design that acknowledges a future crematorium addition as opposed to <br /> adding the crematorium to an existing design as contained in number 3. <br /> It was suggested to show a schedule of phases with dates showing what is needed and <br /> when. <br /> DPF: It was stated that we are good to go with DD and on through CD. The AD Hoc Committee <br /> updates would be good to have and will be provided by DPW. DD is anticipated in late January. <br /> Someone needs to check with the financial committee for their review/approval timelines, <br /> DPW: Timelines for a construction start in the Fall can be met with the existing plan, without the <br /> Crematorium. <br /> 7.00p Dave excuses himself for a prior scheduled meeting. <br /> Jill: Stated if the PBC Committee has opinions, please provide input. It is helpful to hear feedback <br /> from others related to the Crematorium discussions. The AD Hoc Committee should be heard from <br /> once they have had their meetings December 101h, 2018. <br /> DPF: Addressed the PBC Committee; asking if they have an opinion on the Crematorium regarding <br /> it as an addition, separate building project, and possible design for gas and sewer ready for future. <br /> PBC: A separate building project and/or standalone was briefly discussed, and would allow DPW's <br /> program to continue on schedule. Agrees AD Hoc needs to meet and updates provided to the PBC <br /> as a courtesy. <br /> Jill: Need to be prepared with project schedule dates for Town Meeting if AD Hoc votes For or <br /> Against inclusion of the Crematorium. <br /> 7.30p Jill excuses herself for a prior scheduled meeting. <br /> PBC Meeting 11.29.18 2 <br />