|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-11-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2018
>
2018-11-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:57:46 PM
Creation date
11/30/2018 2:36:28 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A motion was made by. P. Coleman and seconded to accept all VE items presented as recommended by the project team,due to the <br /> constraints to owner's contingency with a depletion currently at 46%, and the project only being 12%complete.Vote: All in favor. <br /> Motion passes. <br /> 7. iGMP 3 Approval <br /> A motion was made by C. Fava=o and seconded by P. Coleman to approve iGMP3 11/8/18 as presented in the amount of <br /> $27,547,942 which will release all Filed Sub Bids and including Elevator, Fire Proofing, Drywall,and Doors and Frames Hardware. <br /> Discussion: P. Coleman states that after additional test pits have been conducted,the$420k pending or projected might be adjusted <br /> based on what is found in those tests. Vote:All in favor: motion passes. <br /> 8. Agenda for Next Meeting(12/13/18) <br /> TOL Confirm acceptance of any VE <br /> Approval of Final GMP <br /> Hastings portion of the meeting ended at 7:50PM <br /> PBC Meeting 11.08.18 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.