|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-09-20-GCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Greenways Corridor Committee-GCC
>
Minutes
>
2011-2019
>
2018
>
2018-09-20-GCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 6:18:58 PM
Creation date
11/20/2018 11:11:59 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - GCC - Greenways Corridor Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Mal has been working on the NOI for the trail at Bridge School. Now that the dam project at <br /> the Old Res is essentially finished, we can go forward. He has the narrative of the project, <br /> and the technical details of the bridge engineering, but still needs some maps and aerial im- <br /> ages. Some small trees may need to be removed for the project, but it will improve the area, <br /> making one formal trail and eliminating several small trails. The chosen route leverages high <br /> ground areas and moves the trail away from muddy areas. It will be a Scout project. <br /> • A trail brushing crew from AMC will come, with Mal's guidance, to work on Route H. They will <br /> start at Bridge School and do as much as they can in a day's work. <br /> • Annual Report - will discuss at October meeting. <br /> Current Business: <br /> • None <br /> New Business: <br /> • Accessible Trail - the Parker Meadow project for building an ADA trail still seems stalled. Mi- <br /> chael Martignetti reached out to Keith. Perhaps we can get the Commission on Disability in- <br /> volved. Unclear what is holding up the project <br /> • Senator Cindy Friedman got $1 million into the Environmental Bond Bill for a trail from LHS <br /> to the Community Center. Keith has asked for an appointment to discuss the project. <br /> Pending Items: <br /> • Concord Ave land management plan (Alex) <br /> • Update from Proposed Routes task force (Keith) <br /> Next Meeting: October 11, 2018, 4:30-6:OOpm, Ellen Stone Room <br /> Future meeting dates: Nov 15, Dec 20 <br /> Respectfully Submitted by <br /> Alexandra Dohan, Secretary <br />
The URL can be used to link to this page
Your browser does not support the video tag.