|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1976-02-09
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1970-1979
>
1976
>
1976-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:42:00 PM
Creation date
7/31/2018 3:18:22 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />2.9.76 <br />Messrs. Jones, Delaplace, and Servarson, Boston Edison Company, met with HIGH TENSION <br />the Board at 9:10 p.m. for presentation of plans for improvement to the WIRE INSTALL - <br />function and appearance of high tension wire installation in Lexington. ATION,EDISON <br />Photos of the right of way were shown and construction plans explained. <br />The project is awaiting D.P.U. final approval. <br />Mr. Briggs' draft letter to the B/A regarding the Millipore petition for MILLIPORE <br />for permission for additional minor construction at the facility was B/A PETITION <br />reviewed. It was voted that the letter, in favor, be approved as written. <br />Board of Appeals notices of hearings to be held on February 19 were re- B/A HEARINGS <br />viewed and subject matter of each explained by the planning director. It 2.19.76 <br />was agreed that no Planning Board comment will be made on the petitions. <br />The meeting adjourned at 9:44 p.m. <br />wo <br />Albert P. Zab' , Clerk <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.