|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1974-02-11
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1970-1979
>
1974
>
1974-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:42:01 PM
Creation date
7/31/2018 3:18:17 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />2.11.74 <br />seconded, it was voted that the planning director report to the Select- <br />men that the Planning Board recommends the laying out of the above- <br />mentioned streets. Reports on Wachusetts Drive and Wachusett Circle <br />are to include a statement that the recommendation expresses no judge- <br />ment by the Planning Board on the manner of construction of the roads. <br />Consideration of recommendation to the Bd. of Selectmen on appointment SILC REPR. <br />of a SILC representative to replace Daniel Small was deferred unxil APPOINTMENT <br />mid-March. <br />At 8:00 p.m., the Board met with the Board of Selectmen for discussion <br />of subject matter to be presented at a meeting with Commissioner Camp- <br />bell, State DPW, scheduled for Feb. 13, 1974, regarding proposed <br />Hartwell Ave. connector Rd., improvements to Bedford St., and fringe <br />parking area. A diagram showing the locations of the connector and <br />parking lot was shown by Mr. McSweeney, Dir., Public Works/Engr., and <br />referrence was made by Dr. Clarke to the course of the connector through <br />;^ Topher Swamp and the Tophet Swamp study currently being conducted by <br />C. E. Maguire, Inc. The Boards concurred in the view that the Hartwell <br />Ave. connector and improvements to Bedford St. are of highest priority. <br />The Planning Board returned to its office at 8:20 p.m. <br />HARTWELL AVE. <br />CONNECTOR & <br />BEDFORD ST. <br />Mr. Briggs' draft of a letter to the B/A (hearing 2/19), expressing CURTIN B/A <br />conditional approval of the Curtin petition for expansion of an exist- PETITION <br />ing non -conforming structure on Marrett Rd. was reviewed and was approved <br />as amended. <br />Draft of a letter reflecting Planning Board opposition to the granting CORAZZINI B/A <br />of special permit to Richard Corazzini (hearing 2/19) for retail sale PETITION <br />of nursery products on Blossom St., was approved as amended. <br />Mr. John Frey, DAC, read a July 1973, report by John Davies, DAC, on RUSSELL SQ. <br />the proposed Russell Square condominium development, and made additional <br />comments regarding preservation of historic features of the existing <br />Russell House. Mr. Frey agreed to prepare a written report on the pro- <br />posal on which the Planning Board recdmmendations to Board of Appeals <br />will be based (hearing 2/26). <br />At 9 p.m., the members joined the Appropriations Committee for discus- PLANNING BD. <br />sion of funds requested by the Planning Board in ARticles 85, 86, and FUNDING ART. <br />87, for hiring of consultants for wetland studies, updating of the STUDIES <br />Master Plan, and various other planning studies. Following this meeting, <br />the Board returned to its office for further discussion of the abovemen- <br />tioned Articles. <br />The meeting adjourned at 11:30 p.m. <br />1 <br />p4i <br />Paul J. MacKenzie, Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.