|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1973-02-05
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1970-1979
>
1973
>
1973-02-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:42:02 PM
Creation date
7/31/2018 3:18:14 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />page 2 <br />2.5.73 <br />design by the L.H.A. has been formulated, to charge a maximum of $1,000 <br />per unit was explained. Public Hearing on rezoning of the Drummer Boy <br />land is scheduled for Feb. 15, 1973. <br />Dr. Clarke who had attended a meeting with the Selectmen at 8:30 p.m. SCATTERED SITE <br />reported on L.H.A. Chairman, Temple Scanlon's report on progress of the HOUSING-LHA <br />scattered site housing project proposed for specific tax -title lots in <br />Lexington. The Board was informed of the vote of the Selectmen to ex- <br />tend the 1 year moratorium on the abovementioned tax -title lots beyond <br />March 30, 1973 to Sept. 30, 1973, at which time Mr. Scanlon will again <br />report to the Bd. of Selectmen. <br />The Board reviewed a preliminary subdivision plan submitted on Jan.29, <br />1973, for land at the Rte. 128/Rte.2 interchange in the Hobbs Brook <br />Basin area which is on the Lexington/Waltham line. Mr. Briggs was <br />asked to confer with the proponent, C-R Trust, concerning sewer and <br />water provisions and road construction and design. The matter will <br />again be considered at the Feb. 12 meeting. <br />The February 1 Public Information Meeting on the proposed Wetland <br />Protection rezoning Article was discussed. Methods for polling <br />verbal questions, public reaction and information gathered by map <br />guides was considered as well as procedure for answering written <br />questions. Dr. Clarke reported on Mr. Nickerson's request that Board <br />of Appeals and Planning Board members meet for an in-depth explanation <br />of the proposed Article because of extensive involvement of the Appeals <br />Board if rezoning occurs. <br />CR TRUST <br />SUBDIVISION <br />WETLAND ART. <br />PUBLIC INFO. <br />MTG. <br />The revised draft by Mr. Graham of Planning Board statement on the RTE.2 ENVIRON - <br />Route 2 Draft Environmental Impact Statement was read by the members MENTAL IMPACT <br />and editorial changes made. Following addition of a section referring STATEMENT <br />to Bedford St., Mr. Graham will give the revised draft to Chairman <br />Kenney, Board of Selectmen, and to Mr. John Wofford, BTPR Director, <br />who has requested this information as soon as possible. <br />Letters from the Town Engineer, dated Jan. 31, 1973, regarding BOND AMOUNTS <br />recommended bond amounts in Idylwilde, Springdale, Emerson Gardens IDYLWILDE <br />and Hartwell Park subdivisions were noted. It was agreed that followingSPRINGDALE <br />conference by Mr. Briggs with Mr. McSweeney as to methods used in arriv-EMERSON GARD. <br />ing at the figures stated, Dr. Clarke will be informed and will make HARTWELL PK. <br />recommendations on behalf of the Planning Board as to concurrence with <br />Mr. McSweeney's recommendations. <br />Board of Appeals notices of hearings to be held on Feb. 20, 1973, were <br />reviewed. It was agreed that the "Milliken Rd." and the International B/A HEARINGS <br />Conservatory of Music petitions will be investigated and more detailed MILLIKEN RD. <br />information obtained and assessment as to need for Planning Board commentlNT. CONS. OF <br />on these petitions will be made on Feb. 12. MUSIC <br />Mr. Briggs reported on the visit of John Tuttle, Scott Properties, and <br />discussion of an alternate proposal for development of land at WellingtotvILLOW RIDGE <br />Lane. Length of a cul-de-sac included in this plan and question as to it§UBD• <br />actual point of origin were discussed. <br />The meeting was adjourned at 11 p.m. <br />^ <br />Thomas F. Costello, Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.