Laserfiche WebLink
5-28-58 <br />.4 - <br />necessary to have a town decision on the re -zoning <br />proposal as soon as possible. <br />With reference to taxes, Mr. Blakeley said <br />that office buildings had the highest per square foot <br />cost in contrast to regional shopping centers. He <br />stated that buildings of the type C.C.& F. wou-Idpro- <br />pose had a potential cost of $10 to $18 per square <br />foot. <br />Mr. Blakeley displayed a proposed site plan <br />for the area of approximately 200 acres, said plan <br />being dated May 23, 1958. He described the area as <br />being located in such a way that it offered a pro- <br />tective environment for buildings and direct access <br />to Route 2 and Spring Street. He indicated how the <br />road system was planned so that when Route 2 became <br />a limited access highway, direct access to the area <br />would be obtained from Spring Street. Mr. Blakeley <br />stated that he thought Spring Street was adequate to <br />accommodate the traffic generated by 3000 to !}000 <br />employees, the number he estimated would work in the <br />proposed district. <br />The meeting adjourned at 9:45 p.m. , <br />Ar <br />to <br />Thomas S. Grindle <br />Chairman <br />1 <br />