Laserfiche WebLink
11 <br />1 <br />4-7-58 <br />-3- <br />The matter of sidewalks in the subdivision SIDEWALKS <br />was also reviewed, it being noted that the Board had <br />not required the construction of sidewalks in the <br />first section of the Loring Hill development. It <br />was noted also that the estimated cost of the re- <br />quired work to be done in the second section of said <br />development had not included the construction of <br />sidewalks. It was decided torrequire the construc- <br />tion of sidewalks on one side of the streets in the <br />second section but that the Board would not ask the <br />Superintendent of Public Works to revise the estimate <br />to include cost of said walks for the reason that <br />the subdivider had filed with the Board a bond based <br />on the cost of said estimate. <br />The Board discussed further the location and <br />construction of sidewalks in all subdivisions as <br />set forth under Sec. V.B.9 of the Subdivision Rules <br />and Regulations. In order to facilitate the admin- <br />istration of this particular paragraph of said regu- <br />lations) Mr. Snow was requested to discuss with the <br />Superintendent of Public Works the development of a <br />procedure wherein the location of sidewalks would be <br />shown on definitive subdivision plans and the cost <br />of said walks included in the acceptance of estimates <br />of the cost of performing the various items of re- <br />quired work in the subdivisions. <br />Mr. Snow reported that during the previous week <br />a definitive plan for the subdivision of the Sandy <br />Brook Corp. land northeasterly of Lowell Street <br />and southeasterly of East Street had been filed <br />with an application for approval of said plan. He <br />stated that he had not signed the application as <br />deemed to have been submitted after noting that the <br />plan appeared to be incomplete. It was decided <br />that the way located between lots 47 and 48 shown <br />on the plan was to be constructed to the south- <br />easterly property line of the corporation's land, <br />that such utilities as the Superintendent of Public <br />Works wished to recommend be provided in said way, <br />and that said Superintendent be notified of the <br />Board's decision. <br />The Board next reviewed Mr. Snow's preliminary <br />studies for the Massachusetts Avenue crossing of <br />Emerson Road, particularly with regard to obtain- <br />ing an option for acquisition of part of the Millyan <br />land for the location of said Emerson Road. It was <br />decided that Messrs. Grindle and Snow should discuss <br />with the Selectmen the proposed road location since <br />the Millyan residence was within the proposed right - <br />OAR HILL <br />ESTATES <br />SE3. 1 <br />MILLYAN <br />OPTION <br />