|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1957-10-03
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
1950-1959
>
1957
>
1957-10-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 2:42:12 PM
Creation date
7/31/2018 3:17:00 PM
Metadata
Fields
Template:
Archives
Author or Source
Planning Board
Department
Planning
Keywords or Subject
PB-1 to PB-24, 1918-1988 Planning Board Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1^-3-57 <br />vantage, that using the recommended arrangement only one <br />' system of drains need to be constructed in the subdivision, <br />and that these drains could be located within the street <br />rights of way and be connected directly with the catch <br />basins used to collect surface runoff from the streets. <br />In addition to the above matters, a number of <br />others were discussed. There appeared to be some differ- <br />ence of opinion in regard to development costs. It was <br />agreed that Mr. Snow would consult with the Recreation Com- <br />mittee to determine just how large an area was to be recom- <br />mended for acquisition for recreation purposes. It was <br />agreed also that after this area was determined the Planning <br />Board would consult with the Superintendent of Public Works <br />obtaining from him construction requirements and cost esti- <br />mates for developing the subdivision proposals and that <br />after this information was obtained it might be necessary <br />for the sup_ erintendent and the Board to discuss said inform- <br />ation with Iiessrs. IicCormack and Brun and their engineers. <br />In agreeing to do this, it was understood by the Board that <br />its recommended general street arrangement was to be used <br />in developing the subdivision whether or not the town ac- <br />quired a recreation area as proposed. <br />-aP�e <br />Thomas S. Grindle, <br />Chairman <br />ADDENDUM <br />September 7,1957 <br />I�ir. Paul J. McCormack <br />1775 Nassachusetts Avenue <br />Lexington, Massachusetts <br />Dear I,ir. 'McCormack: <br />In regard to the land in the rear of the Harrington School which <br />you proposed to subdivide, we have -tudied the scheme submitted to <br />' you by the Lexington Planning Board and , in reference thereto, <br />have the following comments to.:make. <br />The plan received was drawn to the scale of 200 feet to an inch. <br />This was enlarged to the scale of 100 feet to an inch so that the <br />Messrs. IicCormack <br />and <br />Brun left <br />the meeting at <br />' <br />10:00 p..m. at which time <br />the <br />meeting was <br />adjourned. <br />-aP�e <br />Thomas S. Grindle, <br />Chairman <br />ADDENDUM <br />September 7,1957 <br />I�ir. Paul J. McCormack <br />1775 Nassachusetts Avenue <br />Lexington, Massachusetts <br />Dear I,ir. 'McCormack: <br />In regard to the land in the rear of the Harrington School which <br />you proposed to subdivide, we have -tudied the scheme submitted to <br />' you by the Lexington Planning Board and , in reference thereto, <br />have the following comments to.:make. <br />The plan received was drawn to the scale of 200 feet to an inch. <br />This was enlarged to the scale of 100 feet to an inch so that the <br />
The URL can be used to link to this page
Your browser does not support the video tag.