Laserfiche WebLink
1 <br />1 <br />Monday, October 25, 19511 <br />Presents Grindle, Hathaway, Irwin, Jaquith, Ripley - Snow, Stevens <br />Meeting opened at 7:45 o'clock. In the absence of Mr. Adams, Mr. <br />Irwin was elected chairman pro tem. <br />Bills <br />The following bills were presented: Commonwealth of Massachusetts, <br />1 set maps, $2.00; 200 procedure charts, $11.00; Louise M. Baker, secretarial <br />service -Oct. 4, 11, 18 and 25, $20.00, postage, hearings, $1.74; Adams Press, <br />advertising hearings, Battle Green, $3.75, Sarano, $8.75. •Unanimously voted <br />the bills be paid. <br />Form A <br />Plan of land in Lexington, Mass. drawn by Chas. H. Stimpson,Jr.,C.E., <br />Weston, dated Oct. 22, 1951, and submitted by Carrie L. Pilkington and Flor- <br />ence Baldwin, co-owners. _ <br />Plan of a portion of Sun Valley in Lexington, Mass., dated Oct. 17, <br />1954, and submitted by DeVries Construction Co., Inc., George J. DeVries, Pres. <br />It was unanimously voted the above plans be signed and endorsed."Approv- <br />al of Lexington Planning Board not required under subdivision lana." . <br />Ledgelawn Avenue <br />Nineteen citizens in the neighborhood of Ledgelawn avenue were present <br />for discussion re: Ledgelawn Ave. Mr. James J. Dolan, 17 Hamilton Rd., speak- <br />ing for the group stated that the neighborhood was disturbed because Ledgelawn <br />avenue was apparently being opened through. This they feared would result in <br />an increase in both heavy and speedy traffic with resulting danger to their <br />children. There was considerable discussion. One suggestion was that a road <br />block be put across the street. The group was advised that it was not in the <br />power of the Planning Board to erect road blocks. The matter was taken under <br />advisement and Mr. Dolan will be advised of the result of consideration. <br />It was suggested that Mr. Snow talk with Mr. Burns about the 110' ease- <br />ment, and with Mr. Friel to find out if he had granted any rights in the rough <br />road and what his intentions were in regard to finishing the street. <br />Lincoln Terrace <br />Mr. Stevens stated that he had sent a letter to Mr. James A. Carrig ad- <br />vising that easement of Mrs. Carrig granted to the town in connection -with sub- <br />division of land on Lincoln Terrace related only to the water main. He has pre- <br />pared a new instrument conveying a similar easement for sanitary sewer which <br />had been installed. He has received the transfer of title and therefore pre- <br />pared for the Planning Board a certificate of approval certifying that the work <br />performed by Jags A. Carrig as provided in the agreement of Sept. 21, 195.'3 has <br />been completed to the satisfaction of the Town Engineer and is approved. A <br />majority of the Board signed the certificate Oct. 25, 1954. <br />