|
Lexington Home Page
|
Help
|
About
|
Browse
Search
1981-07-13
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Board of Health-BOH
>
Minutes
>
1980-1989
>
1981
>
1981-07-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 9:48:50 AM
Creation date
7/31/2018 3:09:54 PM
Metadata
Fields
Template:
Archives
Author or Source
Board of Health
Department
Board of Health
Keywords or Subject
BOH-3 to BOH-5, 1947-1987 BOH Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />July 6, 1981 <br />Mr. Francis W. K. Smith <br />49 North Hancock Street <br />Lexington, Massachusetts 02173 <br />RE: REQUEST FOR VARIANCE TO REDUCE THE LEACHING AREA FOR A SUBSURFACE <br />SEWAGE DISPOSAL SYSTEM - LOT A & C CLEMATIS ROAD - PLAN DATED AUGUST <br />1980 BY MILLER AND NYLANDER <br />Dear Mr. Smith: <br />At its regular meeting on June 8, 1981 the Lexington Board of Health reviewed your <br />request to reduce the size (leaching area) for the above referenced subsurface(septic) <br />system plan which was previously approved by the Board of Health in September of 1980. <br />As the Board of Health understands this request, it is made based on the fact that <br />municipal sanitary sewerage which was anticipated has not yet been constructed as <br />of this date and your request is necessary to facilitate occupancy. <br />After reviewing your situation in consultation with the Town Engineering Department <br />it was voted to approve your request for a variance with the following conditions: <br />1. Application for a permit to construct a subsurface (septic) sewage <br />disposal system be made prior to any construction on this system. <br />(Application enclosed) <br />2. A copy of the new plan showing changes be submitted for approval. <br />(A new plan has already been submitted by your contractor) <br />3. That the area for construction be the same as originally approved <br />and that the system be constructed in such a way that should it <br />be necessary to construct the system as originally designed and <br />approved the new design will not impede construction. <br />4. That this house be connected to municipal sewerage as soon as <br />practicable after municipal sewerage becomes available. <br />5. That the system as originally designed and approved be completed <br />should a premature failure of the revised plan (system) occur. <br />6. That the system be constructed as originally designed and approved <br />if it becomes apparent that municipal sewerage will not be made <br />available to service your house. (The status of municipal sewerage <br />is to be reviewed with you at 12 month increments until such time <br />as your house is connected to municipal sewerage or the system is <br />constructed as originally designed and approved. <br />7. That if your property should be sold that the status of municipal <br />sewerage and/or construction of the originally designed system be <br />re-evaluated. <br />8. That this variance is not transferable without approval of the Board <br />of Health. <br />
The URL can be used to link to this page
Your browser does not support the video tag.