Laserfiche WebLink
1 <br />1 <br />81 <br />Mr. Smith said he met with Mr. Gompers' Engineer, Mr. Mark Donahue of <br />Charles Perkins and Co. of Clinton, Mass. and Mr. Charles Vasiliou of Erland <br />Construction Co. at the site to inspect deep test observation holes for water <br />table determinations. <br />W. Clifford Prentiss, Conservation Administrator and W. Jerry Martin, <br />Asst. Town Engineer accompanied Mr. Smith. <br />Mr. Smith reported that after making the initial observations and upon <br />returning to the office he inspected the plans submitted to the Planning Board <br />and found that the deep test observation holos had been made on the wrong prop- <br />erty. <br />Mr. Smith stated he immediately notified both the engineers involved on <br />the project of the apparent error and a further detail check of the site plan <br />showed that the deep test hole had been made on the wrong property. An ap- <br />pointment was cancelled when it was found that it was impossible to get to the <br />site with the equipment they had. No valid tests were made at that time. <br />Mr. Gompers is planning to build on this site an office building similar <br />to the one Spaulding & Slye have planned to construct on Forbes Road. Mr. <br />Smith said the area was very wet and in order to service this building it <br />would require a variance by the Board to grant permission to use a holding <br />tank. Mr. Smith said he couldn't see a holding tank in this area. <br />This problem was tabled until further information was available. <br />Mr. Smith reported that a Memo from David Kinlock, M. D. Deputy Commissioner <br />of Public Health stating that the Chapters of the Environmental Code concerning <br />swimming pools, bathing beaches and family -type camping grounds would continue BATHING <br />to be effective and enforceable by the local Boards of Health. REGULATIONS <br />The letter (copy) to Mr. Hutchinson from Kenneth A. Tarbell, Chief of the <br />LAND- Land & Water Use Section of Metropolitan Boston, Northeast Region regarding <br />_FILL the Solid Wastes at the Hartwell Avenue Landfill was read by the Board. <br />This letter agreed to extend the submission date of operation engineering <br />plans until April 1, 1978. Mr. Tarbell stated that the 90 day extension did <br />not provide enough time to gather the necessary data for the design of an ef- <br />fective method of controlling or eliminating leachate at the landfill. The <br />operational plan must include methods and schedules proposed for the necessary <br />information regarding the leachate problem as well as when an appropriate <br />system for leachate control can be designed and implemented. <br />The following permits were signed by the Board: <br />Rubbish Permit <br />S.C.A. Disposal Service <br />Food Service Permits <br />Arno's Deli <br />Folien Church kitchen <br />Pilgrim Church kitchen <br />Temple Emunah kitchen <br />Pilgrim Congregational Church kitchen <br />Hancock United Church of Christ kitchen <br />Simon W. Robinson Lodge -Masonic Temple <br />St. Nicholas Greek Orthodox Church <br />