Laserfiche WebLink
Greenways Corridor Committee <br /> September 26, 2016 <br /> Parker Room, Town Office Building <br /> Lexington, Massachusetts <br /> Members Present: Peggy Enders, Eileen Entin, Don Grant, Bob Hausslein, Susan Kenyon, <br /> Keith Ohmart, Mike Tabaczynski <br /> Votes: Minutes 6/16/2016: Approved <br /> Reports/Updates: <br /> - Brochure Distribution: Susan reported that 4 student volunteers distributed brochures over <br /> the summer. As of this date about 12,000 brochures (of the 15,000 that were printed) have <br /> been distributed. Susan has 4 volunteers to distribute brochures this fall. At this point she has <br /> met with two of them. <br /> - Grove St.: The builder has submitted plans to the planning board. There are no plans for the <br /> Town to purchase the property. No new action on the committee's part is required at present. <br /> - MA DOT Right of Way/Montessori School Conservation Restriction: The request for a right of <br /> way is moving forward slowly. Carol Kowalski, on behalf of the Town, will submit a formal re- <br /> quest to the DOT to use the access road. Mike and Keith will continue to follow this. <br /> - DCR Lot 1 Trail Development: Keith and Mike are working with the Brookhaven Nature Com- <br /> mittee on an application to DCR to put in a trail. The Conservation Commission will provide a <br /> letter of support. <br /> - Route G Installation: During the inaugural walk on Route G on Sept 25, we determined that a <br /> few additional directional signs would be advisable. Bob will take care of these. Mike will ad- <br /> just the Route G map to concur with the signed path through Lower Vine Brook. <br /> - Shire Trail Update: Final construction will occur on Oct 7 with the help of a corporate group <br /> from Shire. This trail could be linked to the new development on Lincoln St. abutting the Cam- <br /> bridge Watershed property and Cranberry Hill. The committee will discuss the possibility of a <br /> new route in this area at a future meeting. <br /> - Route B around Clarke Middle School: Eileen reported that because of the construction go- <br /> ing on at Clarke, we need to provide a different way to get from Brookside to the entrance to <br /> Dunback Meadows. Bob and Eileen will look at the options and install temporary signs. Keith <br /> will check the A route at Diamond, which is also undergoing significant construction, to see if <br /> any temporary route modifications are required. <br /> Ongoing: <br /> - Route F extension/Minuteman National Park trail signs. Keith will contact John Livsey to set <br /> up a meeting to discuss possible ways to get across Rte 2A in light of any possible Town plans <br /> for improvements around Old Mass Ave/Rte 2A. <br />