|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-09-05-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2017
>
2017-09-05-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:36 PM
Creation date
7/10/2018 3:13:22 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEP 201-1066, BL 1023 <br /> NOI, 960-1010 Waltham Street <br /> Owner/applicant: Symmes Life Care dba Brookhaven at Lexington <br /> Project: Addition of assisted living facility and associated site work <br /> Mr. Hamilton explained that he has watched the LexMedia video from the last meeting and has <br /> signed the affidavit. <br /> Mr. Wolk recused himself from the hearing. <br /> Bill Dailey- Attorney, Jim Friedlich- President, Jim Borabach- Project Engineer, Jeanne Krieger- <br /> President of the Board of Trustees <br /> Mr. Dailey explained that since the last meeting on 8/7/2017, they have met with the planning <br /> board and had a positive meeting. They are continued with the Planning Board until they receive <br /> Conservation approval. <br /> Mr. Borabach stated that they have addressed the commission's issues regarding snow and ice <br /> removal. Snow fencing will be placed along 100 ft. of drive near the brook and include signage. <br /> The sidewalks will be treated with a drop spreader. They have also worked with the neighbors to <br /> calm some of their concerns. The team has met with the Engineering Department several times to <br /> review the project and have now received their approval. Engineering has since allowed them to <br /> bring the water line across the culvert crossing rather than under the brook. The O and M plan <br /> has been modified. <br /> Additionally, the applicant has provided pictures and Stream Stats showing the portion of <br /> Chester Brook on site to be perennial. One wing of the new building has been moved outside of <br /> the 50 ft. buffer. The wetland replication plan has been changed slightly to alleviate some the <br /> concerns regarding the separation of the roadway and the replication area. <br /> Mr. Hamilton entered the engineering report into the record. <br /> Questions and comments from the Commission: <br /> The commission asked if there was a provision for public access to the public land behind the <br /> property. Mr. Friedlich stated that there is access through sidewalks on the property. They are <br /> working with GCC to ensure this. <br /> Motion to close the hearing made by Mr. Langseth and seconded by Mrs. Dohan. Vote: 4-0 in <br /> favor. <br /> 9:26pm <br /> DET 17-21 <br /> RDA, 5 Battle Green Road <br /> Owner/applicant: Poline Gasparian <br /> Project: Emergency connection to town drainage system <br /> This hearing has been withdrawn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.