|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2017-09-05-CONCOM-min
Breadcrumb Navigation:
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2017
>
2017-09-05-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:36 PM
Creation date
7/10/2018 3:13:22 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
drainage system. Mr. Orwig stated that there is a series of alternating pumps and they are located <br /> below the frost line. They said that the Department of Public Works had no concerns about the <br /> proposal. <br /> Mr. Hamilton entered the engineering report into the record. <br /> Questions and comments from the Commission: <br /> The commission asked if there is any chance that the overflow to the street may freeze. Mr. <br /> Orwig stated that they have designed around that. <br /> Motion to issue a Negative Determination with conditions made by Mrs. Dohan and seconded by <br /> Mr. Langseth. Vote: 5-0 in favor. <br /> 7:32pm <br /> DET 17-25 <br /> RDA, 149 Adams Street <br /> Owner/applicant: Mary Beth Sweeney and Larry Conway <br /> Project: New deck <br /> Krisoulva Voliakrus- Designer and builder <br /> Ms. Voliakrus explained that they are proposing to build a new deck over an existing patio. They <br /> will use helical footings from the deck. The proposed deck is outside of the 50 ft. buffer and no <br /> new roof area is proposed. <br /> Questions and comments from the Commission: <br /> The commission asked that the applicant remove the old erosion controls that were in place from <br /> a prior project. The applicant agreed. <br /> Motion to issue a Negative Determination with Conditions made by Mr. Langseth and seconded <br /> by Ms. Ladd. Vote: 5-0 in favor. <br /> 7:38pm <br /> Commissioner Richard Wolk arrived. <br /> 7:38pm <br /> DET 17-26 <br /> RDA, 23 Hamblen Street <br /> Owner/applicant: LexInvest Inc. <br /> Project: Raze and rebuild Single Family home <br /> Rich Kirby- LEC Environmental, Dan Taylor- Builder <br />
The URL can be used to link to this page
Your browser does not support the video tag.