Laserfiche WebLink
Mr. Pavlik explained that since the last meeting, he has provided details regarding the <br /> contingency planting plans as well as the refueling process. Mr. Pavlik stated that in case of the <br /> need to refuel the 500 gallon tank, a truck will drive down the path and refuel it. <br /> Questions and comments from the Commission: <br /> The commission stated that they still think that the refueling process would be difficult because <br /> of the terrain of the path. Mr. Pavlik stated that they will look into getting a smaller truck to <br /> perform the refueling. <br /> The commission stated that they want a fuel spill containment plan in place. The commission <br /> stated that they are comfortable with Ms. Mullins approving the plan. <br /> Motion to close the hearing made by Mr. Wolk and seconded by Mr. Beuttell. Vote: 5-0 in favor. <br /> Motion to issue the Order of Conditions made by Mr. Wolk and seconded by Mr. Beuttell. Vote: <br /> 5-0 in favor. <br /> 7:10pm <br /> NEW MEETINGS/HEARINGS <br /> DET 17-17 <br /> RDA, 450 Bedford Street <br /> Owner: Bedford Street Limited Partnership <br /> Applicant: Caruth Capital LLC <br /> Project: Building entrance and lobby upgrades <br /> Kate Remel- Caruth Capital <br /> The representative for Caruth Capital from BSC explained that Caruth is doing improvements to <br /> their entrance area. As part of the project, they are reworking the patio. She explained that <br /> overall, there will be a reduction in overall impervious surface. <br /> Questions and comments from the Commission: <br /> The commission stated that they need to see a detail of the proposed pervious paver patio. Once <br /> submitted, the commission has authorized Ms. Mullins to approve this design. <br /> Motion to issue a Negative Determination with Conditions made by Mrs. Dohan and seconded <br /> by Mr. Beuttell. Vote: 5-0 in favor. <br /> 7:17pm <br /> DET 17-18 <br /> RDA, 758 Marrett Rd <br /> Owner/applicant: Minuteman Regional Vocational Technical School District <br /> Project: Repair work to existing sewer <br />