|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-03-20-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2010-2019
>
2018
>
2018-03-20-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:14:22 PM
Creation date
6/28/2018 2:39:53 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents: Plan 3/19/2018, Drainage analysis 1/12/2018 <br /> Mr. Russell explained that originally one infiltration system was proposed to capture the roof <br /> runoff from the garage. During construction, the contractor was unable to get all of the roof <br /> runoff to the proposed system, so he installed an additional system. The second system is not <br /> functioning properly because it is in the groundwater. Mr. Russell is proposing to increase the <br /> size of the original system to capture the roof runoff as well as the runoff from the impermeable <br /> patio. <br /> Mr. Hamilton entered the Engineering report into the record. <br /> Questions and comments from the Commission: <br /> The commission asked if the expanded infiltration system has been installed. Mr. Russell stated <br /> that it has not been installed. Once they get approval they will install it. <br /> The commission stated that they would like to see FENO markers placed along the 25 ft. buffer <br /> and across the finger of land that extend far behind the house. They are concerned about mowing <br /> in the wetlands area. The applicant stated that they will not mow in that area and are open to <br /> FENO markers. <br /> Motion to close the hearing made by Mr. Beuttell and seconded by Ms. Dohan. Vote: 4-0 in <br /> favor. <br /> 7:28pm <br /> DEP 201-XXXX, BL XXXX <br /> NOI, 23 Hill Street <br /> Owner/applicant: Kazumi Wada <br /> Project: Raze and rebuild SFD <br /> Scott Smyers and Jonathan Shuster- Oxbow Associates <br /> Documents: NOI package 2/28/2018, Plan2/26/2018, Drainage analysis 2/26/2018 <br /> Mr. Smyers explained that the applicant is proposing to raze and rebuild a single family home. <br /> The home will be in the same location as the existing house. The wetland is just off of the <br /> property line. Infiltration systems are proposed. FENO markers are proposed along the 25.ft. <br /> buffer. <br /> Mr. Hamilton entered the engineering report into the record. <br /> Questions and comments from the Commission: <br /> The commission asked how far the house is from the wetlands. The applicant stated that it is 56 <br /> ft. away. <br />
The URL can be used to link to this page
Your browser does not support the video tag.