Mr. Kirby explained that they had proposed a restoration area on the side of the property. As part <br /> of the restoration, they were going to create a stream that would flow into a pipe and outlet onto <br /> the neighboring town owned wetland. During construction, it was discovered that the previous <br /> owner brought some additional fill into the area and now the stream will not flow into the pipe. <br /> Showed presentation. Proposing stream that goes beneath sewer access road. They found that <br /> the previous owner had brought fill in when Artis took control of the property in 2017. The fill <br /> was put in where the pipe was supposed to go. They are proposing to remove some fill and <br /> regrade the area so that the stream will flow into the pipe. <br /> Questions and comments from the Commission: <br /> The commission asked what the approximate limit of fill is and if there was fill in the wetland <br /> area. Mr. Novak explained that they only know the level of fill in the area where they are <br /> working. They did not want to disturb the rest of the site. <br /> Motion to approve the insignificant plan change made by Mr. Beuttell and seconded by Ms. <br /> Dohan. Vote: 4-0 in favor. <br /> 6:52pm <br /> 98 East St. Request for Insignificant Plan Change. Modify the plan to construct a second story <br /> above garage within the 200-foot Riverfront Area and 100-foot buffer zones from wetland and <br /> bordering land subject to flooding <br /> Mike Novak, Meridian and Sean Kennedy, owner <br /> Mr. Novak explained that they were taking a phased approach to the construction on the house. <br /> The sports court and shed have been constructed. They are now proposing to add a second story <br /> to the garage. There is no increase in impervious area. The contractor will not have to change the <br /> limit of work line to do this phase of construction. <br /> Questions and comments from the Commission: <br /> The commission stated that there is a lot of construction happening in a sensitive area. The <br /> applicant stated that the contractor is very aware of the limit of work line. <br /> The commission asked if the restoration piece has been completed. The applicant explained that <br /> this will be done in the spring. <br /> The commission asked if the snow fencing and silt sock were still in place. The applicant stated <br /> that they are. <br /> The commission stated that it appears there is an overhang off the second story addition. The <br /> applicant explained that the perceived overhang is actually the first floor. The second story is <br /> slightly smaller. <br />