CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> Project Description Amount Funding Committee Recommends <br /> Requested Source <br /> (i) Public Facilities <br /> Mechanical/Electrical System $544,500 GF(Debt) Approval (6-0) <br /> Replacements <br /> "This request is part of an annual replacement of HVAC and electrical systems that have exceeded their <br /> useful lives and require replacement before excessive failures occur. The FY2019 appropriation will be <br /> used to replace the HVAC systems that provide cooling and heating to the Selectmen's Meeting Room <br /> and the Main Server Room in the Town Office Building. The mechanical systems have exceeded their life <br /> cycles and require replacement in order to prevent unplanned interruptions. If failures occur, it would <br /> severely impact the Town Office Building's ability to conduct public meetings during the height of <br /> cooling season. <br /> (Brown Book XI-9) <br /> Article 22:Appropriate Funding <br /> Amount Requested Committee Recommends <br /> For Visitors Center— Source <br /> Construction/Bid <br /> Documents & $200,000 GF(Free No Position <br /> $4,575,000 Cash) + $4,375,000 <br /> Construction GF (Debt) (3-3) <br /> "$21,000 was appropriated by the 2017 Annual Town Meeting to enable the Visitors Center replacement <br /> project to proceed through development of a schematic design estimate. The schematic design estimate <br /> provided an estimated project cost of $4,549,000. An additional appropriation of $150,000 was <br /> appropriated by the 2017-3 Special Town Meeting to continue the design through design development. <br /> During design development, a value engineering process will explore opportunities to reduce the project <br /> cost and find alternate funding sources. $200,000 requested for FY2019 to prepare construction/bid <br /> documents. The existing facility opened in 1970 and the last upgrade was performed ten years ago when <br /> the restrooms were made handicap accessible. A new Visitors Center aims to improve the experience of <br /> visitors and maximize economic development opportunities." <br /> (Brown Book XI-19) <br /> Since the Brown Book was published, the Board of Selectmen (BoS) voted to include, in addition to the <br /> earlier planned request for $200,000 for the construction/bid documents, an additional $4,300,000 in <br /> construction funds—for a total of$4,500,000. The staff then had a proposal to increase the construction <br /> funds to include an additional $200,000 associated with the temporary facilities (yet to be determined) <br /> that would provide the Center's services during the demolition of the current building and the <br /> construction of the new building—raising the total to $4,700,000—the amount this Committee had <br /> supported (4-2) with the extra $200,000 as a placekeeper to ensure there would be sufficient funds to <br /> achieve all the proposed objectives. <br /> The staff subsequently provided to the BoS at its March 26, 2018, meeting a draft Motion with a revised <br /> proposal that reduces the additional funding related to the temporary facilities to $75,000—revising the <br /> total to $4,575,000. The BoS did not take a vote of its position on that Motion, but the majority would <br /> support the $4,575,000 over the $4,500,000. At this Committee's meeting later that evening, after further <br /> deliberations, this Committee re-voted its position on including the construction funding (without regard <br /> to which final amount the BoS would support) and the result was 3-3; therefore, no position. At the BoS <br /> meeting on April 2, 2018, it voted to support this Article at$4,575,000. <br /> Note: The following is based on the spoken report made by this Committee during the Town Meeting <br /> deliberation, April 2, 2018, on this Article. <br /> This Committee unanimously supports an updated and expanded Visitors Center to provide enhanced <br /> services to Lexington's growing visitor population. Further, we recognize the long planning and funding <br /> period that this project has endured. We accept that the program developed by the Board of Selectmen <br /> 58 <br />