Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> The following shows the past use of each year's appropriation for the Administrative Budget. <br /> Use of the CPA Administrative Budget <br /> Amounts (rounded) <br /> Fiscal Appropriation Percentage Returned to <br /> Year Each Year Used Used the CPF <br /> 2007 $25,000 $926 4% $24,074 <br /> 2008 $50,000 $45,495 91% $4,505 <br /> 2009 $75,000 $75,000 100% $0 <br /> 2010 $81,270 54% $68,730 <br /> 2011 $52,784 35% $97,216 <br /> 2012 $78,955 53% $71,045 <br /> 2013 $96,577 64% $53,423 <br /> 2014 $150,000 $77,490 52% $72,510 <br /> 2015 $121,911 81% $28,089 <br /> 2016 $61,844 41% $88,156 <br /> 2017 $54,871 37% $95,129 <br /> Total $1,350,000 I $747,123 55% $602,877 <br /> Article 11:Appropriate Funding <br /> Funds Requested Committee Recommends <br /> for Westview Cemetery Source <br /> Building Construction N/A N/A Indefinite Postponement <br /> (6-0) <br /> "FY2019 funds are requested to construct a new building on the Westview Cemetery grounds. The <br /> current building serves as the cemetery office, meeting area for grieving families and work space for <br /> maintenance staff An FY2016 appropriation funded an assessment of the current building and operations <br /> and an FY2018 appropriation was used to hire an architect to design and engineer the building on the <br /> Westview Cemetery grounds. The Department of Public Works and the Architect have been working <br /> closely with the Department of Public Facilities to determine the best long-term solution for the building. <br /> This funding request has been based on the FY2018 design and engineering funds. <br /> "The only significant upgrade to the building in the last 15 years has been the installation of a new roof <br /> The current facility has deteriorated and needs to be brought up to code. Limited space does not permit <br /> private space for grieving families and the maintenance area lacks adequate space for all equipment to be <br /> stored indoors. The renovation or expansion of the building will enhance the cemetery operation by <br /> providing a welcoming and private space for families and visitors and provide staff with more efficient <br /> and adequate office space, storage space and maintenance space. It is expected that a full set of design <br /> specifications and documents will be completed in the near future at which time the construction phase of <br /> the project can go out to bid." <br /> (Brown Book XI-11) <br /> Although consideration was given to both renovation and expansion, the BoS ultimately decided that a <br /> new building was the proper course to take—and this Committee concurred. The design is almost <br /> complete, and the project is expected to go out to bid this spring. <br /> While this Committee supports the need for a new building, based on the information provided at the time <br /> of this report, this Committee believes it is premature to be appropriating construction funds. The <br /> primary objection is that while progress has been made toward the completion of Design Development, <br /> the project's cost estimate is only at Schematic Design—a stage that history has shown is far more often <br /> than not an inadequate definition for knowing a realistic construction cost estimate. Although the prior <br /> funding is reported as being sufficient to carry the project through Design Development and <br /> Construction/Bid Documents, it is the final evolution of the design and a later cost estimate that provides <br /> a credible—albeit never guaranteed—basis for a construction-cost estimate upon which to base <br /> 43 <br />