Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> Project Description(CPA Category) Amount Funding Committee Recommends <br /> Requested Source <br /> (g) Athletic Facility Lighting $975,000 CPF (Cash) Approval (6-0) <br /> (Recreational Land) <br /> "The FY2019 request is for $975,000 to replace the existing lighting systems and structures with more <br /> cost efficient fixtures and illuminants at the Center #1 Baseball Field, Center #2 Softball Field, Center <br /> Basketball Courts and the Gallagher Tennis Courts. Funds will also be used to upgrade the lighting <br /> system at the Irving H. Mabee Town Pool Complex. The current lighting system is outdated, requires <br /> constant repair and does not operate efficiently. The installation of newer energy and cost efficient <br /> systems will provide financial savings to the Town and allow for a safer environment in which to <br /> participate in night activities." <br /> (Brown Book XI-22) <br /> This Committee initially had reservations about this project as the Athletic Fields could be the location of <br /> a new high school or be needed during construction of a new high school. However, our concerns were <br /> assuaged by reassurances from the School Committee and the Department of Public Facilities that the <br /> proposed lighting work on this other side of Park Drive would not likely interfere with a future <br /> high—school project. lf, on the remote chance, that Fields #1 & #2 became part of the high—school <br /> construction plans,the above-ground lighting infrastructure could be temporarily stored elsewhere. <br /> Project Description(CPA Category) Amount Funding Committee Recommends <br /> Requested Source <br /> (h) Center Track and Field $2,829,000 <br /> Reconstruction(Recreational Land) CPF (Debt) + <br /> $3,340,000 $511,000 GF Approval (6-0) <br /> (Debt) <br /> "The Center Track area is one of the most heavily used facilities in Town. The existing track base is over <br /> 30 years old and the track surface was last re-coated in 2012, adding an additional 5-6 years to the life of <br /> the track. The track currently presents tripping hazards and is unsafe to host organized programming. This <br /> FY2019 request will completely reconstruct the track and provide for a complete renovation to the <br /> athletic field. Funding will also provide for the installation of a new lighting system and the replacement <br /> of existing bleachers and fencing. <br /> "A natural grass/synthetic turf hybrid field is proposed for the new athletic field and will provide more <br /> stability while looking, feeling and playing like a natural grass field. The reconstruction will allow for <br /> allow for continued high use for a wide range of users and provide a safer and more comfortable track <br /> surface." <br /> (Brown Book XI-8 & 16) <br /> This Committee initially had reservations about this project as the Center Track area could be the location <br /> of a new high school, or be needed during construction of a new high school. However, these concerns <br /> were overcome by the value of the track to the high-school athletic department and broader Lexington <br /> community. The track cannot be resurfaced again and will be shut down within the next year if the <br /> reconstruction doesn't occur. Additionally, the timing, location, and scope of the high-school project are <br /> extremely uncertain. The proximal location of the Vine Brook to the Center Track reduces the chances <br /> that it could become the permanent home of a new high school. <br /> 40 <br />