|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2018-06-27-CEC-ATM-rpt (Combined Report with Updates & Errata)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2018
>
Reports
>
2018-06-27-CEC-ATM-rpt (Combined Report with Updates & Errata)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:22:56 PM
Creation date
6/28/2018 8:53:35 AM
Metadata
Fields
Template:
Archives
Year
2018
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM (incorporating Updates & Errata)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2018 ATM(incorporating Updates&Errata) <br /> Documents totaling $189,750 ($72,000 under 2016 ATM, Article 15(e), and $117,750 under 2017 ATM, <br /> Article 16(e)). For requested FY2019 funding, see Article 20(f). <br /> At present, there is no decision on use of the space in the Muzzey High Condominiums that previously <br /> housed the Town's Senior Center. Deed restrictions on that space limit it to uses for the benefit of seniors. <br /> The Carriage House, located next to the LexCC and acquired with it, also has deed restrictions that limit <br /> its use. DPF currently maintains both spaces in a caretaker mode. <br /> Fire & Rescue <br /> The Fire & Rescue Department uses industry standards and its own experience to establish its <br /> capital—equipment replacement schedule. Unlike many pieces of Town equipment, fire engines and medic <br /> trucks (rescue-ambulances) are partially custom-made and equipped, require detailed specifications, and <br /> typically require many months between placing the order and the delivery and acceptance. <br /> The mission of this Department in the 21' century has shifted beyond traditional firefighting to <br /> emergency services, homeland security, and community education, with our firefighters now being <br /> trained for Emergency Medical Services (EMS) and Advanced Life Support (ALS). The equipment to <br /> perforin these missions has changed with new technologies for firefighting and communications, yet the <br /> basic pumper truck,ladder truck, and rescue ambulance are still essential to the mission. <br /> The FY2019 Capital Budget has no requests for this department. The primary, on-going, capital effort for <br /> this Department is the construction of a sorely needed new Headquarters to meet 21st-century standards. <br /> The BoS has agreed that this will be best achieved at the Headquarters current location at <br /> 45 Bedford Street, with an interim operating facility ("swing space") during construction at the <br /> 173 Bedford Street site that had been purchased in October 2016. Both of these projects are being <br /> executed by the DPF. The Headquarters project was approved by the voters in the December 4, 2017, <br /> Debt-Exclusion Referendum. (See the description of that DPF capital program on Page 28.) <br /> The Federal Government has mandated that public-safety agencies—including Lexington's <br /> Fire&Rescue and Police Departments—will be required to move their radio-band frequency from the <br /> current 400 MHz band, to the 800 MHz band. This will require a complete replacement of radio <br /> equipment, including hand-held, mobile, and base stations. The radio system was upgraded and changed <br /> in 1994, at a cost of over $1,000,000. A change to the new frequency band will be a capital project <br /> affecting both Departments. These Departments are currently studying how to best comply with the new <br /> mandates when they are put into effect. Cost estimates will follow once the scope and timing of the <br /> project are clearly defined. <br /> Lexington must continue to replace its aging equipment and retain backup capacity. The table on the next <br /> page includes the forecasted need for replacing major capital vehicles in the current Department <br /> inventory. <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.