Laserfiche WebLink
<br />Selectmen – May 29, 2018 <br />Page 1 of 7 <br /> <br />SELECTMEN'S MEETING <br />Tuesday, May 29, 2018 <br />A meeting of the Lexington Board of Selectmen was called to order at 4:00 p.m. on Tuesday, <br />May 29, 2018 in the Selectmen’s Meeting Room of the Town Office Building. Ms. Barry, Chair; <br />Mr. Pato; Mr. Lucente; and Ms. Hai were present as well as Mr. Valente, Town Manager; Ms. <br />Siebert, Recording Secretary. Ms. Ciccolo was absent. <br />Announcements <br />Mr. Valente’s retirement party will take place on Thursday, August 2, 2018 from 4 to 6 p.m. in <br />Battin Hall of the Cary Memorial Building. <br />Several Selectmen will attend the Association of Black Citizens of Lexington (ABCL) meeting <br />on Thursday, May 31, 2018. <br />Update—Center Streetscape <br />Ms. Barry stated that the presentation tonight is an opportunity for the Board to be updated on <br />the project prior to the Center Streetscape Public Meeting scheduled for 7 p.m. on Monday, June <br />11, 2018 in Battin Hall of the Cary Memorial Building. <br />Dave Pinsonneault, DPW Director, and John Livsey, Town Engineer, provided the most recent <br />information for Board comment. Mr. Pinsonneault stated that the presentation will focus on <br />recent actions, project goals, and preliminary cost estimates. <br /> Recent actions <br />Taking the Selectmen’s direction following the Center Streetscape Design Review Ad Hoc <br />Committee report, the Center Streetscape Working Group has worked toward the goal of <br />finalizing the 25% design. To that end, two reports have been generated: one by Public <br />Archaeology Laboratory (PAL) which conducted an historic resource assessment to tie the <br />current landscape back to how it was originally developed; and a second by Bartlett Tree to <br />conduct a street tree inventory that will form the basis of a tree management plan. <br /> Project Goals <br />There are three primary goals: Safety, Accessibility; and Renewal of the Mid-Century Modern <br />Landscape. <br /> Preliminary Cost Estimate to Construct=$9.2M <br />The cost estimate is based on 2018 pricing comparisons and assumes work will be done in one <br />phase as opposed to three, as previously envisioned. The work area was defined as Meriam <br />Street to the Police Headquarters driveway at 1575 Massachusetts Avenue. The estimate does not <br />include funds already expended but does include all elements of the 25% design; contingency; <br />construction administration; and police details which will be substantial due to the high-traffic <br />corridor. An updated cost estimate will be calculated at the 100% design threshold. Mr. <br /> <br />